4 working DC fast chargers in Kalkaska
All verified working this week, with 0 Level 2 ports across ChargePoint Network.
Stations · 2
NORTHLAND FOODS STATION 1
2101 US 131NORTHLAND FOODS STATION 2
2101 US 131Which EV Charging Networks Operate in Kalkaska, MI?
Looking for Tesla? Find Tesla Superchargers nationwide .
Infrastructure Grade
100% DC Fast
Based on DC Fast Charger ratio
2 of 2 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Jun 23, 2026
Data sourced from U.S. DOE AFDC
As of June 2026, Kalkaska, Michigan has 2 publicly accessible EV charging stations with 2 charging ports. ChargePoint Network operates 100% of stations in the area — part of Michigan's 2,139 stations statewide.
100% of ports (2) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include CCS, CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.
Drivers needing more charging options can find 47 stations in nearby Traverse City, approximately 35 miles away. See how MI compares with Ohio for broader regional context.
What Is the EV Charging Outlook for Kalkaska?
High-Speed Charging Hub
Kalkaska has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.
ChargePoint Network Stronghold
ChargePoint Network leads the market in Kalkaska with 100% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Kalkaska?
Traverse City, Michigan
Petoskey, Michigan
Grayling, Michigan
Cadillac, Michigan
Empire, Michigan
Gaylord, Michigan
Interlochen, Michigan
Thompsonville, Michigan
Frankfort, Michigan
Charlevoix, Michigan
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: June 21, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."