Latest reported · Aug 10, 2026

3 working DC-fast stations in Lewis Center

All verified working this week, with 2 Level 2 ports across ChargePoint Network, eVgo Network.

Latest reported availability
3 working now none down

Active charging locations · 4

98% working at Ohio · verified Aug 10, 2026

Showing 4 useful public-access records selected from 4 active locations. Counts distinguish locations from 10 ports and 6 connector-type records; availability is periodically refreshed, not live.

COUGHLIN KIA DC FAST 2

5342 Columbus Pike
Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo
Working
eVgo Network DC Fast 6 ports CCS/SAE Combo

COUGHLIN KIA DC FAST 1

5342 Columbus Pike
Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo

BZ EVANS FARM F3-EVANS FARM

5920 Evans Farm Drive
Working
ChargePoint Network Level 2 2 ports J1772

Local charging snapshot

Lewis Center charging basics

4 public stations with 10 charging ports. 8 DC fast ports (80%) for quicker stops , plus 2 Level 2 ports (20%) for longer stays.

AFDC data last synced August 10, 2026.

4
stations
10
ports
8
DC fast
2
Level 2
Charging costs and cheapest hours in Lewis Center
Home charging costs
Compare Ohio electricity prices →

Cheapest time to charge today

The cheapest, greenest grid window in Lewis Center today is 2 AM – 5 AM EDT, based on PJM Interconnection day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.

Nearby city charging pages around Lewis Center

EV charging questions for Lewis Center

Which EV charging networks operate in Lewis Center, OH?

Lewis Center has 2 charging networks. ChargePoint Network operates 75% of stations, serving 4 total stations.

What is the EV charging outlook for Lewis Center?

80% of Lewis Center's charging ports are DC fast chargers and 20% are Level 2.

When is the cheapest time to charge an EV in Lewis Center?

Today's cheapest, greenest grid window in Lewis Center is 2 AM – 5 AM EDT, based on PJM Interconnection day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Dataset snapshot: August 10, 2026. Availability is periodically refreshed.