Verified · Jun 21, 2026

4 working DC fast chargers in Marysville

All verified working this week, with 58 Level 2 ports across ChargePoint Network, Blink Network, Non-Networked.

Live reliability
4 working now none down

Stations · 27

98% working at Ohio · verified Jun 7, 2026

255 at Union Station Apartments

2101 Railway Lane
Working
Blink Network Level 2 8 ports J1772
95% working

EVPassport - Home2 Suites

400 Colemans Crossing Blvd
Working
Non-Networked Level 2 4 ports J1772
98% working

Applied Electric, LLC - Honda Marysville

640 Colemans Crossing Boulevard
Working
Blink Network DC Fast 3 ports J1772 + CCS/SAE Combo
95% working

URE PARKING LOT 1

15461 US-36
Working
ChargePoint Network Level 2 2 ports J1772
99% working

MARYSVILLECITY PLUM ST PRK LT1

115 S Plum St
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Working
Blink Network Level 2 2 ports J1772
95% working

HOLOWICKI STATION 1

1305 W 5th St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

HOLOWICKI STATION 2

1305 W 5th St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

MARYSVILLE DUBLIN JEROME 1

10190 US-42
Working
ChargePoint Network Level 2 2 ports J1772
99% working

MARYSVILLE DUBLIN JEROME 2

10190 US-42
Working
ChargePoint Network Level 2 2 ports J1772
99% working

HONDA HERITAGE HHC1

24025 Honda Parkway
Working
ChargePoint Network Level 2 2 ports J1772
99% working

HONDA HERITAGE HHC2

24025 Honda Parkway
Working
ChargePoint Network Level 2 2 ports J1772
99% working

HONDA HERITAGE HHC4

24025 Honda Parkway
Working
ChargePoint Network Level 2 2 ports J1772
99% working

HONDA HERITAGE HHC3

24025 Honda Parkway
Working
ChargePoint Network Level 2 2 ports J1772
99% working

ODRC ORW STATION 1

1479 Collins Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

ODRC ORW STATION 2

1479 Collins Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

MARYSVILLECITY CITY HL PRK LT1

118 W 7th St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

MARYSVILLEFLATS STATION 1

1001 Columbus Avenue
Working
ChargePoint Network Level 2 2 ports J1772
99% working

MARYSVILLEFLATS 2- CT4020

429 Homestead Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

MARYSVILLEFLATS 3-CT4020

830 Otway Road
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Home charging in Ohio costs 18.78¢/kWh — a full charge (60 kWh) costs about $11.27. Compare electricity prices →
All 27 stations active as of 2026-06-21 See full Ohio outage report →

Which EV Charging Networks Operate in Marysville, OH?

Infrastructure Grade

5% DC Fast

Based on DC Fast Charger ratio

3 of 61 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 27
Ports per Station 2.3

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Marysville, Ohio has 27 publicly accessible EV charging stations with 61 charging ports. ChargePoint Network operates 85.2% of stations in the area, followed by Blink Network at 11.1% — part of Ohio's 2,071 stations statewide.

5% of ports (3) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 95% (58) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Ohio's EV infrastructure compares with Pennsylvania.

What Is the EV Charging Outlook for Marysville?

Level 2 Focused Infrastructure

Marysville's charging network emphasizes Level 2 charging (95% of ports), ideal for overnight and workplace charging.

ChargePoint Network Stronghold

ChargePoint Network leads the market in Marysville with 85% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Marysville?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Marysville

1 hotel with on-site EV charging · 4 Level 2 ports

EVPassport - Home2 Suites

Level 2

400 Colemans Crossing Blvd

🔌 4 ports · Public

Level 2: full charge (~200–300mi) in 8 hrs overnight

📍 View on Map
"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."

Brent Gruber

Executive Director, EV Practice, J.D. Power

Source: J.D. Power 2025 Public Charging Study (August 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.