Verified · Jun 21, 2026

7 working DC fast chargers in Lancaster

All verified working this week, with 21 Level 2 ports across ChargePoint Network, Non-Networked, Blink Network.

Live reliability
7 working now none down

Stations · 13

98% working at Ohio · verified Jun 7, 2026

Bob Boyd Ford - L2

2840 North Columbus Street
Working
Blink Network Level 2 6 ports J1772
95% working

Sugar Crossing Convenience Store

2049 Hornsmill Rd SE
Working
FCN DC Fast 4 ports CHAdeMO + CCS/SAE Combo
98% working

Bob Boyd Ford - DCFC

2840 North Columbus Street
Working
Blink Network DC Fast 4 ports CCS/SAE Combo
95% working

Bob Boyd Ford

2840 N Columbus St
Working
Non-Networked Level 2 2 ports J1772
98% working

SCP NORTH LOT

720 Mill Park Dr
Working
ChargePoint Network Level 2 2 ports J1772
99% working

SCP SOUTH LOT

720 Mill Park Dr
Working
ChargePoint Network Level 2 2 ports J1772
99% working

THE BEND VC BEND EV1

1541 Timbertop St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

THE BEND VC BEND EV2

1541 Timbertop St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

GOOGLE GOOGLELANCASTER

231 Whiley Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Working
IN_CHARGE DC Fast 2 ports CHAdeMO + CCS/SAE Combo
98% working
Working
Non-Networked Level 2 1 port J1772
98% working

LANCASTEROH DC FAST 1

135 W Chestnut St
Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo
99% working
Home charging in Ohio costs 18.78¢/kWh — a full charge (60 kWh) costs about $11.27. Compare electricity prices →
All 13 stations active as of 2026-06-21 See full Ohio outage report →

Which EV Charging Networks Operate in Lancaster, OH?

Infrastructure Grade

34% DC Fast

Based on DC Fast Charger ratio

11 of 32 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 13
Ports per Station 2.5

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Lancaster, Ohio has 13 publicly accessible EV charging stations with 32 charging ports. ChargePoint Network operates 53.8% of stations in the area, followed by Non-Networked at 15.4% — part of Ohio's 2,071 stations statewide.

34% of ports (11) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 66% (21) are Level 2 chargers suited for longer stops. Available connector types include CCS, CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Ohio's EV infrastructure compares with Pennsylvania.

What Is the EV Charging Outlook for Lancaster?

Strong Fast Charging Network

34% of charging ports in Lancaster are DC fast chargers, providing good options for quick charging sessions.

Diverse Network Coverage

With 5 different charging networks available, EV drivers in Lancaster have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Lancaster?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"These results show we're moving in the right direction, but there's still work to do to ensure all EV drivers have access to reliable, welcoming public charging."

Joel Levin

Executive Director, Plug In America

Source: Plug In America (October 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.