Verified · Jun 21, 2026

1 working DC fast charger in Westerville

All verified working this week, with 31 Level 2 ports across ChargePoint Network, Tesla Destination, Blink Network.

Live reliability
1 working now none down

Stations · 17

98% working at Ohio · verified Jun 7, 2026

Germain Volkswagen of Westerville - DCFC

750 Polaris Parkway
Working
Blink Network DC Fast 4 ports CCS/SAE Combo
95% working

LAKESHORE EV STATION 1

575 McCorkle Blvd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Renaissance Columbus Westerville Polaris Hotel - Tesla Destination

409 Altair Pkwy
Working
Tesla Destination Level 2 2 ports Tesla
98% working

LAKESHORE EV STATION 2

575 McCorkle Blvd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

WESTERVILLE CITY HALL 1

21 W College Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

WESTERVILLE CITY HALL 2

21 W College Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

WESTERVILLE UPTOWN LOT G 2

64 E Walnut St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

WESTERVILLE UPTOWN LOT G 1

64 E Walnut St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

WESTERVILLE SPORTS COM 1

325 N Cleveland Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

WESTERVILLE SPORTS COM 2

325 N Cleveland Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

WESTERVILLE COM CENTER 1

350 N Cleveland Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

WESTERVILLE COM CENTER 2

350 N Cleveland Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

NEW ALBANY NEW ALBANY MOB3

5150 E Dublin Granville Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

NEW ALBANY NEW ALBANY MOB2

5150 E Dublin Granville Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

NEW ALBANY NEW ALBANY MOB1

5150 E Dublin Granville Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

The Residences at Phillips Farm

6440 Phillips Farm Road
Working
Blink Network Level 2 2 ports J1772
95% working

The Park Building - Tesla Destination

79 South State Street
Working
Tesla Destination Level 2 1 port Tesla
98% working
Home charging in Ohio costs 18.78¢/kWh — a full charge (60 kWh) costs about $11.27. Compare electricity prices →
All 17 stations active as of 2026-06-21 See full Ohio outage report →

Which EV Charging Networks Operate in Westerville, OH?

Infrastructure Grade

11% DC Fast

Based on DC Fast Charger ratio

4 of 35 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 17
Ports per Station 2.1

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Westerville, Ohio has 17 publicly accessible EV charging stations with 35 charging ports. ChargePoint Network operates 76.5% of stations in the area, followed by Tesla Destination at 11.8% — part of Ohio's 2,071 stations statewide.

11% of ports (4) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 89% (31) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS). Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Ohio's EV infrastructure compares with Pennsylvania.

What Is the EV Charging Outlook for Westerville?

Level 2 Focused Infrastructure

Westerville's charging network emphasizes Level 2 charging (89% of ports), ideal for overnight and workplace charging.

ChargePoint Network Stronghold

ChargePoint Network leads the market in Westerville with 77% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Westerville?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."

Brent Gruber

Executive Director, EV Practice, J.D. Power

Source: J.D. Power 2025 Public Charging Study (August 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.