3 EV Charging Stations in Bexley, OH
Locations, networks, and charger types — updated weekly from U.S. DOE data
3 EV charging stations in Bexley — 2 Non-Networked, 1 Tesla Destination . Last updated May 9, 2026.
Where Are the 3 Charging Stations in Bexley?
Which EV Charging Networks Operate in Bexley, OH?
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 6 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Bexley, Ohio has 3 publicly accessible EV charging stations with 6 charging ports. Non-Networked operates 66.7% of stations in the area, followed by Tesla Destination at 33.3% — part of Ohio's 2,069 stations statewide.
All 6 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Available connector types include Tesla (NACS). Learn more in our EV connector types guide. View national charging statistics for broader context.
Drivers needing more charging options can find 342 stations in nearby Columbus, approximately 6 miles away. See how OH compares with Pennsylvania for broader regional context.
What Is the EV Charging Outlook for Bexley?
Level 2 Focused Infrastructure
Bexley's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
Non-Networked Stronghold
Non-Networked leads the market in Bexley with 67% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Bexley?
Columbus, Ohio
Dublin, Ohio
Marysville, Ohio
Piketon, Ohio
Westerville, Ohio
Grove City, Ohio
Heath, Ohio
Lancaster, Ohio
Marion, Ohio
Newark, Ohio
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."