Verified · Jun 21, 2026

5 working DC fast chargers in Pacific Grove

All verified working this week, with 23 Level 2 ports across ChargePoint Network, RIVIAN_WAYPOINTS, Tesla Destination.

Live reliability
5 working now none down

Stations · 16

98% working at California · verified Jun 7, 2026

Country Club Gate Center - Tesla Supercharger

200 Country Club Gate Center
Working
Tesla DC Fast 12 ports Tesla
98% working

Safeway 761 (Pacific Grove, CA)

1212 Forest Ave
Working
Electrify America DC Fast 4 ports CCS/SAE Combo
98% working

Best Western The Inn & Suites Pacific Grove - Tesla Destination

660 Dennett St
Working
Tesla Destination Level 2 3 ports J1772 + Tesla
98% working

MBA 160 SPACE 6 HC

160 Central Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

MBA 160 SPACE 17 18

160 Central Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

MBA 160 SPACE 15 16

160 Central Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

MBA 160 SPACE 4 5

160 Central Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PG CITYLOT2 ST3

207 16th St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PG CITYLOT2 ST4

223 16th St
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PGI PACIFIC GARDENS

709 Asilomar Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PG CITYLOT2 ST1

223 16th St
Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo
99% working

PG CITYLOT2 ST2

207 16th St
Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo
99% working

Asilomar State Beach - Lot K

800 Asilomar Ave
Working
RIVIAN_WAYPOINTS Level 2 1 port J1772
98% working

804 Crocker Ave

804 Crocker Ave
Working
RIVIAN_WAYPOINTS Level 2 1 port J1772
98% working
Home charging in California costs 33.35¢/kWh — a full charge (60 kWh) costs about $20.01. Compare electricity prices →
All 16 stations active as of 2026-06-21 See full California outage report →

Which EV Charging Networks Operate in Pacific Grove, CA?

Infrastructure Grade

44% DC Fast

Based on DC Fast Charger ratio

18 of 41 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 16
Ports per Station 2.6

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Pacific Grove, California has 16 publicly accessible EV charging stations with 41 charging ports. ChargePoint Network operates 68.8% of stations in the area, followed by RIVIAN_WAYPOINTS at 12.5% — part of California's 20,670 stations statewide.

44% of ports (18) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 56% (23) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how California's EV infrastructure compares with Oregon.

What Is the EV Charging Outlook for Pacific Grove?

Strong Fast Charging Network

44% of charging ports in Pacific Grove are DC fast chargers, providing good options for quick charging sessions.

Diverse Network Coverage

With 5 different charging networks available, EV drivers in Pacific Grove have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Pacific Grove?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Pacific Grove

1 hotel with on-site EV charging · 1 Tesla Destination · 3 Level 2 ports

Best Western The Inn & Suites Pacific Grove

⚡ Tesla

660 Dennett St

🔌 3 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map
"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."

Brent Gruber

Executive Director, EV Practice, J.D. Power

Source: J.D. Power 2025 Public Charging Study (August 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.