Verified · Jun 21, 2026

10 working DC fast chargers in Cupertino

All verified working this week, with 260 Level 2 ports across ChargePoint Network, Tesla Destination, POWERFLEX.

Live reliability
10 working now none down

Stations · 116

98% working at California · verified Jun 7, 2026

Target - Tesla Supercharger

20745 Stevens Creek Boulevard
Working
Tesla DC Fast 28 ports Tesla
98% working

Homestead High School

21370 Homestead Rd
Working
POWERFLEX DC Fast 22 ports CHAdeMO + J1772
98% working

Cupertino High School

10100 Finch Ave
Working
POWERFLEX Level 2 16 ports J1772
98% working

Monta Vista High School

21840 McClellan Rd
Working
POWERFLEX DC Fast 16 ports CHAdeMO + J1772
98% working

Main Street Cupertino - Tesla Supercharger

19500 Vallco Parkway
Working
Tesla DC Fast 10 ports Tesla
98% working

Hyatt House San Jose/Cupertino - Tesla Destination

10380 Perimeter Rd
Working
Tesla Destination Level 2 8 ports Tesla
98% working

KCR Dev - Hyatt House

10380 Perimeter Rd
Working
POWERFLEX Level 2 8 ports J1772
98% working

Whole Foods Market

20955 Stevens Creek Blvd
Working
eVgo Network DC Fast 4 ports CHAdeMO + J1772
98% working
Working
eVgo Network DC Fast 3 ports CHAdeMO + J1772
98% working
AMPUP Level 2 3 ports J1772
98% working
Working
Non-Networked Level 2 2 ports J1772
98% working

Ridge Vineyards Monte Bello - Tesla Destination

17100 Montebello Rd
Working
Tesla Destination Level 2 2 ports J1772 + Tesla
98% working
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PROMETHEUS BILTMORE

10159 S Blaney Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

MAIN STREET MSC 7

19500 Stevens Creek Blvd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

CUPERTINO STATION 01

10800 Torre Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

CUPERTINO QUINLAN 1

10185 Stelling Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

CUPERTINO QUINLAN 2

10185 North Stelling Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

MAIN STREET MSC 4

19500 Stevens Creek Blvd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

MAIN STREET MSC 8

19500 Stevens Creek Blvd
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Home charging in California costs 33.35¢/kWh — a full charge (60 kWh) costs about $20.01. Compare electricity prices →
2 stations reported unavailable as of 2026-06-21 See full California outage report →

Which EV Charging Networks Operate in Cupertino, CA?

Infrastructure Grade

16% DC Fast

Based on DC Fast Charger ratio

48 of 308 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 116
Ports per Station 2.7

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Cupertino, California has 116 publicly accessible EV charging stations with 308 charging ports. ChargePoint Network operates 87.1% of stations in the area, followed by Tesla Destination at 3.4% — part of California's 20,670 stations statewide.

16% of ports (48) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 84% (260) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how California's EV infrastructure compares with Oregon.

What Is the EV Charging Outlook for Cupertino?

Diverse Network Coverage

With 7 different charging networks available, EV drivers in Cupertino have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Cupertino?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Cupertino

2 hotels with on-site EV charging · 1 Tesla Destination · 16 Level 2 ports

Hyatt House San Jose/Cupertino

⚡ Tesla

10380 Perimeter Rd

🔌 8 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map

KCR Dev - Hyatt House

Level 2

10380 Perimeter Rd

🔌 8 ports · Public

Level 2: full charge (~200–300mi) in 8 hrs overnight

📍 View on Map
"We are putting in charging stations where people are, where people are running errands. They're going grocery shopping, they go to work. That's where we put our charging stations."

Badar Khan

CEO, EVgo

Source: Yahoo Finance (March 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.