Verified · Jun 21, 2026

18 working DC fast chargers in Oakland

All verified working this week, with 482 Level 2 ports across ChargePoint Network, Non-Networked, FLASH.

Live reliability
18 working now none down

Stations · 157

98% working at California · verified Jun 7, 2026

Zum Services, Inc.

4919 Tidewater Ave
Working
Non-Networked DC Fast 74 ports CCS/SAE Combo
98% working

Pacific Renaissance Plaza Garage

388 9th St.
Working
FLASH Level 2 40 ports J1772
98% working

Airport Corporate Center

7677 Oakport St
Working
POWERFLEX Level 2 36 ports J1772 + Tesla
98% working

Rotunda Garage

529 17th St.
Working
FLASH Level 2 32 ports J1772
98% working

Marriott Convention Center Garage

550 11th St.
Working
FLASH Level 2 32 ports J1772
98% working

Ava Charge - City Center West Garage

1231 Jefferson Street
Working
EV Connect DC Fast 31 ports CHAdeMO + CCS/SAE Combo
90% working

City Center Garage

525 14th St.
Working
FLASH Level 2 24 ports J1772
98% working

Coliseum Center - Tesla Supercharger

640 Hegenberger Road
Working
Tesla DC Fast 16 ports Tesla
98% working

Oakland International Airport - Premier Lot

1 Airport Dr
Working
Non-Networked Level 2 16 ports J1772
98% working

Frank G Mar / Harrison Garage

1200 Harrison St.
Working
FLASH Level 2 16 ports J1772
98% working

Lake Merritt Plaza

1999 Harrison St
Working
VIALYNK Level 2 14 ports J1772
94% working

Jack London Square Market Garage #4 - Tesla Supercharger

255 2nd Street
Working
Tesla DC Fast 12 ports Tesla
98% working

1111 Broadway

1111 Broadway
Working
Blink Network Level 2 9 ports J1772
95% working

Golden State Warriors Corporate Office - Tesla Destination

1011 Broadway
Working
Tesla Destination Level 2 8 ports J1772 + Tesla
98% working

Jack London Square

409 Washington St.
Working
eVgo Network DC Fast 8 ports CHAdeMO + CCS/SAE Combo
98% working

3333 Fruitvale Ave

3333 Fruitvale Ave
Working
eVgo Network DC Fast 8 ports CCS/SAE Combo
98% working

10950 International

10950 International Blvd
Working
eVgo Network DC Fast 8 ports CHAdeMO + CCS/SAE Combo
98% working

Citi Trends Oakland

900 Market St
Working
eVgo Network DC Fast 8 ports CCS/SAE Combo
98% working

Oakland International Airport - NF Bus Charging Depot

1 Airport Dr
Working
Non-Networked DC Fast 5 ports CCS/SAE Combo
98% working

CASS, Inc. Oakland - Tesla Destination

2730 Peralta St
Working
Tesla Destination Level 2 4 ports Tesla
98% working
Home charging in California costs 33.35¢/kWh — a full charge (60 kWh) costs about $20.01. Compare electricity prices →
1 station reported unavailable as of 2026-06-21 See full California outage report →

Which EV Charging Networks Operate in Oakland, CA?

Infrastructure Grade

27% DC Fast

Based on DC Fast Charger ratio

182 of 674 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 157
Ports per Station 4.3

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Oakland, California has 157 publicly accessible EV charging stations with 674 charging ports. ChargePoint Network operates 73.2% of stations in the area, followed by Non-Networked at 7.6% — part of California's 20,670 stations statewide.

27% of ports (182) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 72% (482) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how California's EV infrastructure compares with Oregon.

What Is the EV Charging Outlook for Oakland?

Diverse Network Coverage

With 13 different charging networks available, EV drivers in Oakland have excellent flexibility in choosing their preferred provider.

High-Capacity Stations

Charging stations in Oakland average 4.3 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Oakland?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"Overall charger utilization is really moving up and to the right. It's growing much faster than charger installations are growing."

Rick Wilmer

President & CEO, ChargePoint

Source: ABC News / AP (March 2024)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.