Verified · Jun 28, 2026

EV Charging in San Mateo County, California

11 charging stations across San Mateo County — 8 DC fast chargers and 65 Level 2 ports spread across 6 smaller towns.

Infrastructure Grade

11% DC Fast

Based on DC Fast Charger ratio

8 of 73 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 11
Ports per Station 6.6

Data Status

Current

Last updated: Jun 30, 2026

Data sourced from U.S. DOE AFDC

98% working at California · verified Jun 7, 2026

Cheapest Time to Charge an EV in San Mateo County Today

The cheapest, greenest grid window across San Mateo County today is 11 AM – 2 PM PDT, based on CAISO (California ISO) day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.
Cheapest grid window
11 AM – 2 PM
PDT · CAISO (California ISO)
TOU off-peak anchor
~12 AM - 6 AM
Works on any time-of-use plan

Wholesale day-ahead prices via the open-source gridstatus library, refreshed daily. Compare every US grid region →

Larger Cities in San Mateo County

These cities have their own full charging guide.

Charging by Town in San Mateo County

6 smaller towns in San Mateo County, each with its full station list.

Belmont · 3 stations

Belmont, CA has 3 EV charging stations with 58 ports, including 8 DC fast. Electrify America leads local coverage.

Volkswagen Group of America

500-600 Clipper Dr
Working
POWERFLEX DC Fast 50 ports CHAdeMO + J1772
98% working

Safeway 1138 - Belmont, CA

1100 El Camino Real
Working
Electrify America DC Fast 4 ports J1772 + CCS/SAE Combo
98% working

Carlmont Village Shopping Center

1049 Alameda de las Pulgas
Working
eVgo Network DC Fast 4 ports CHAdeMO + CCS/SAE Combo
98% working

Woodside · 3 stations

Woodside, CA has 3 EV charging stations with 5 ports. ChargePoint Network leads local coverage.

The Mountain House Restaurant - Tesla Destination

13808 Skyline Blvd
Working
Tesla Destination Level 2 2 ports Tesla
98% working

SMCCD CAN LOT 6_3

CPWM+FR
Working
ChargePoint Network Level 2 2 ports J1772
99% working

WOODSIDE FIRE FIRE STATION 7

3111 Woodside Road
Working
ChargePoint Network Level 2 1 port J1772
99% working

El Granada · 2 stations

El Granada, CA has 2 EV charging stations with 3 ports. ChargePoint Network leads local coverage.

PPH EV ST1 PPH EV S1

4000 Cabrillo Hwy
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PPH EV ST1 PPH EV S2

4000 Cabrillo Hwy
Working
ChargePoint Network Level 2 1 port J1772
99% working

Hillsborough · 1 station

Hillsborough, CA has 1 EV charging station with 2 ports. ChargePoint Network leads local coverage.

Working
ChargePoint Network Level 2 2 ports J1772
99% working

Loma Mar · 1 station

Loma Mar, CA has 1 EV charging station with 4 ports. Tesla Destination leads local coverage.

YMCA Camp Loma Mar - Tesla Destination

9900 Pescadero Creek Rd
Working
Tesla Destination Level 2 4 ports J1772 + Tesla
98% working

Moss Beach · 1 station

Moss Beach, CA has 1 EV charging station with 1 port. Tesla Destination leads local coverage.

Seal Cove Inn - Tesla Destination

221 Cypress Ave
Working
Tesla Destination Level 2 1 port Tesla
98% working

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 28, 2026

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.