19 EV Charging Stations in Foster City, CA
Locations, networks, and charger types — updated weekly from U.S. DOE data
19 EV charging stations in Foster City — 17 ChargePoint Network, 1 eVgo Network, 1 TURNONGREEN , 4 public DC fast chargers. Last updated May 9, 2026.
Where Are the 19 Charging Stations in Foster City?
Which EV Charging Networks Operate in Foster City, CA?
Infrastructure Grade
10% DC Fast
Based on DC Fast Charger ratio
4 of 39 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Foster City, California has 19 publicly accessible EV charging stations with 39 charging ports. ChargePoint Network operates 89.5% of stations in the area, followed by eVgo Network at 5.3% — part of California's 20,622 stations statewide.
10% of ports (4) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 90% (35) are Level 2 chargers suited for longer stops. Available connector types include CCS, CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.
For regional context, see how California's EV infrastructure compares with Oregon.
What Is the EV Charging Outlook for Foster City?
Level 2 Focused Infrastructure
Foster City's charging network emphasizes Level 2 charging (90% of ports), ideal for overnight and workplace charging.
ChargePoint Network Stronghold
ChargePoint Network leads the market in Foster City with 90% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Foster City?
San Jose, California
San Francisco, California
Santa Clara, California
Menlo Park, California
San Mateo, California
Sunnyvale, California
Palo Alto, California
Redwood City, California
South San Francisco, California
Mountain View, California
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."
Brent Gruber
Executive Director, EV Practice, J.D. Power
Source: J.D. Power 2025 Public Charging Study (August 2025)