Verified · Jun 21, 2026

4 working DC fast chargers in Burlingame

All verified working this week, with 153 Level 2 ports across ChargePoint Network, POWERFLEX, Non-Networked.

Live reliability
4 working now none down

Stations · 89

98% working at California · verified Jun 7, 2026

Embassy Suites - San Francisco Airport Waterfront - Tesla Supercharger

150 Anza Blvd
Working
Tesla DC Fast 20 ports Tesla
98% working

Chula Vista Lot HPCP

1133 Chula Vista Ave
Working
eVgo Network DC Fast 8 ports CCS/SAE Combo
98% working

Burlingame Main Library

1258 Donnelly Ave
Working
POWERFLEX DC Fast 6 ports CCS/SAE Combo
98% working

Burlingame Library

480 Primrose Rd
Working
POWERFLEX DC Fast 6 ports CHAdeMO + CCS/SAE Combo
98% working

BURLINGAME CITY HALL

501 Primrose Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

META BUR103-04

312 Airport Blvd.
Working
ChargePoint Network Level 2 2 ports J1772
99% working

META BUR102-04

322 Airport Blvd.
Working
ChargePoint Network Level 2 2 ports J1772
99% working

META BUR103-03

312 Airport Blvd.
Working
ChargePoint Network Level 2 2 ports J1772
99% working

META BUR103-02

312 Airport Blvd.
Working
ChargePoint Network Level 2 2 ports J1772
99% working

META BUR102-05

322 Airport Blvd.
Working
ChargePoint Network Level 2 2 ports J1772
99% working

META BUR102-06

322 Airport Blvd.
Working
ChargePoint Network Level 2 2 ports J1772
99% working

META BUR102-03

322 Airport Blvd.
Working
ChargePoint Network Level 2 2 ports J1772
99% working

META BUR103-01

312 Airport Blvd.
Working
ChargePoint Network Level 2 2 ports J1772
99% working

META BUR102-08

322 Airport Blvd.
Working
ChargePoint Network Level 2 2 ports J1772
99% working

META BUR101-05

333 Airport Blvd.
Working
ChargePoint Network Level 2 2 ports J1772
99% working

META BUR101-04

311 Airport Blvd.
Working
ChargePoint Network Level 2 2 ports J1772
99% working

META BUR101-06 ADA

333 Airport Blvd.
Working
ChargePoint Network Level 2 2 ports J1772
99% working

META BUR101-07 ADA

333 Airport Blvd.
Working
ChargePoint Network Level 2 2 ports J1772
99% working

META BUR101-12

311 Airport Blvd.
Working
ChargePoint Network Level 2 2 ports J1772
99% working

META BUR101-13

311 Airport Blvd.
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Home charging in California costs 33.35¢/kWh — a full charge (60 kWh) costs about $20.01. Compare electricity prices →
2 stations reported unavailable as of 2026-06-21 See full California outage report →

Which EV Charging Networks Operate in Burlingame, CA?

Infrastructure Grade

21% DC Fast

Based on DC Fast Charger ratio

40 of 193 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 89
Ports per Station 2.2

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Burlingame, California has 89 publicly accessible EV charging stations with 193 charging ports. ChargePoint Network operates 92.1% of stations in the area, followed by POWERFLEX at 2.2% — part of California's 20,670 stations statewide.

21% of ports (40) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 79% (153) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how California's EV infrastructure compares with Oregon.

What Is the EV Charging Outlook for Burlingame?

Diverse Network Coverage

With 7 different charging networks available, EV drivers in Burlingame have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Burlingame?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Burlingame

1 hotel with on-site EV charging

Embassy Suites - San Francisco Airport Waterfront - Tesla Supercharger

DC Fast

150 Anza Blvd

🔌 20 ports · Public

DC Fast: 80% charge in 30–45 min

📍 View on Map
"Overall charger utilization is really moving up and to the right. It's growing much faster than charger installations are growing."

Rick Wilmer

President & CEO, ChargePoint

Source: ABC News / AP (March 2024)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.