Verified · Jun 21, 2026

2 working DC fast chargers in Sherwood

All verified working this week, with 18 Level 2 ports across ChargePoint Network, Tesla Destination, Electrify America.

Live reliability
2 working now none down

Stations · 7

99% working at Oregon · verified Jun 7, 2026
Working
OpConnect Level 2 8 ports J1772
98% working

Walmart 4176 Sherwood

21320 Sw Langer Farms Pkwy
Working
Electrify America DC Fast 4 ports CHAdeMO + J1772
98% working

Ponzi Vineyards - Tesla Destination

19500 SW Mountain Home Rd
Working
Tesla Destination Level 2 2 ports Tesla
98% working

ACKERLYSH STATION 1

16852 SW Edy Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

ACKERLYSH STATION 2

16852 SW Edy Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

SHERWOOD CITY HALL

15690 SW Oregon St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Blakeslee Vineyard Estate

20875 SW Chapman Rd
Working
Non-Networked Level 2 1 port J1772
98% working
Home charging in Oregon costs 14.89¢/kWh — a full charge (60 kWh) costs about $8.93. Compare electricity prices →
All 7 stations active as of 2026-06-21 See full Oregon outage report →

Which EV Charging Networks Operate in Sherwood, OR?

Infrastructure Grade

14% DC Fast

Based on DC Fast Charger ratio

3 of 21 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 7
Ports per Station 3.0

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Sherwood, Oregon has 7 publicly accessible EV charging stations with 21 charging ports. ChargePoint Network operates 42.9% of stations in the area, followed by Tesla Destination at 14.3% — part of Oregon's 1,764 stations statewide.

14% of ports (3) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 86% (18) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Oregon's EV infrastructure compares with California.

What Is the EV Charging Outlook for Sherwood?

Level 2 Focused Infrastructure

Sherwood's charging network emphasizes Level 2 charging (86% of ports), ideal for overnight and workplace charging.

Diverse Network Coverage

With 5 different charging networks available, EV drivers in Sherwood have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Sherwood?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"City-to-city differences in climate, travel patterns, housing, charging preferences, and demographics aren't considerations captured in other infrastructure assessments. Making that data publicly available will prove pivotal as cities work to determine their network needs."

Eric Wood

Senior Researcher, National Renewable Energy Laboratory

Source: NREL (June 2023)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.