Questions about EV charging?

Latest reported · Nov 9, 2026

3 working DC-fast stations in Wooster

Plus 1 reported down this week and 18 Level 2 ports across ChargePoint Network, SWTCH, Tesla Destination.

Latest reported availability
3 working now 1 reported down

Charging around Wooster, OH

Tap a dot for a station, or pick your car to see which stations fit. Dots in the surrounding area open that place's page.

Map of Wooster charging stations
The interactive map loads as you scroll here. Every station is also listed below.
Loading map…

Active charging locations · 12

98% working at Ohio · verified Nov 9, 2026

Showing 12 useful public-access records selected from 12 active locations. Counts distinguish locations from 22 ports and 15 connector-type records; availability is periodically refreshed, not live.

Getting there

Getting into Wooster

Southwest · N Walnut St
2 stations · closest 1.1 km from downtown
South · E Liberty St
2 stations · closest 0.9 km from downtown

CITY OF WOOSTER N BUCKEYE 2

132 E North St

City Of Wooster N Buckeye 2 on E North St has 1 DC fast port (CHAdeMO, CCS) on the ChargePoint Network, open 24/7.

Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo

Wooster Chrysler Jeep Dodge Ram

2626 Cleveland Road

Wooster Chrysler Jeep Dodge Ram on Cleveland Rd has 2 DC fast ports (CCS) on the Blink Network, open 24/7.

Working
Blink Network DC Fast 2 ports CCS/SAE Combo

CITY OF WOOSTER N BUCKEYE 1

151 East North Street

City Of Wooster N Buckeye 1 on East North St has 1 DC fast port (CHAdeMO, CCS) on the ChargePoint Network, open 24/7.

Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo

Wooster Dental

1706 Beall Ave

Wooster Dental on Beall Ave has 2 Level 2 ports, non-networked, free to use and open 24/7.

Working
Non-Networked Level 2 2 ports J1772

Liberty Beall Apartments Parking

365 E Liberty St

Liberty Beall Apartments Parking on E Liberty St has 2 Level 2 ports on the SWTCH network, open 24/7.

Working
SWTCH Level 2 2 ports J1772

SWTCH Energy Inc.

365 E Liberty St

SWTCH Energy Inc. on E Liberty St has 2 Level 2 ports on the SWTCH network, free to use and open 24/7.

Working
SWTCH Level 2 2 ports J1772

Local Roots Market & Café - Tesla Destination

140 S Walnut St

Local Roots Market & Café on S Walnut St has 2 Level 2 ports (J1772, Tesla/NACS) on the Tesla Destination network, free to use and open 24/7.

Working
Tesla Destination Level 2 2 ports J1772 + Tesla

WOOSTER PD03 PD04

3401 Old Airport Rd

Wooster on Old Airport Rd has 2 Level 2 ports on the ChargePoint Network, open 24/7.

Working
ChargePoint Network Level 2 2 ports J1772

CITY OF WOOSTER NE QUAD 1

121 N Market St

City Of Wooster Ne Quad 1 on N Market St has 2 Level 2 ports on the ChargePoint Network, open 24/7.

Working
ChargePoint Network Level 2 2 ports J1772

CITY OF WOOSTER MERCH BLOCK 1

123 N Walnut St

City Of Wooster Merch Block 1 on N Walnut St has 2 Level 2 ports on the ChargePoint Network, open 24/7.

Working
ChargePoint Network Level 2 2 ports J1772

OHIO STATE UNV WOOSTER EVCS1

Gerlaugh Dr

Ohio State Unv Wooster on Gerlaugh Dr has 2 Level 2 ports on the ChargePoint Network, open 24/7.

Working
ChargePoint Network Level 2 2 ports J1772

WCH WCH WINTER ST.

546 Winter St

Wch Winter St. on Winter St has 2 Level 2 ports on the ChargePoint Network, open 24/7.

Working
ChargePoint Network Level 2 2 ports J1772

Local charging snapshot

Wooster charging basics

12 public stations with 22 charging ports. 4 DC fast ports (18%) for quicker stops , plus 18 Level 2 ports (82%) for longer stays.

AFDC data last synced November 9, 2026.

12
stations
22
ports
4
DC fast
18
Level 2
Charging costs and cheapest hours in Wooster
Home charging costs
Compare Ohio electricity prices →

Cheapest time to charge today

The cheapest, greenest grid window in Wooster today is 2 AM – 5 AM EST, based on PJM Interconnection day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.

Nearby city charging pages around Wooster

EV charging questions for Wooster

Which EV charging networks operate in Wooster, OH?

Wooster has 5 charging networks. ChargePoint Network operates 58.3% of stations, serving 12 total stations.

What is the EV charging outlook for Wooster?

18% of Wooster's charging ports are DC fast chargers and 82% are Level 2. The city has diverse network coverage with 5 providers.

When is the cheapest time to charge an EV in Wooster?

Today's cheapest, greenest grid window in Wooster is 2 AM – 5 AM EST, based on PJM Interconnection day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Dataset snapshot: November 9, 2026. Availability is periodically refreshed.