Verified · Jun 21, 2026

7 working DC fast chargers in Canton

All verified working this week, with 113 Level 2 ports across ChargePoint Network, Non-Networked, Tesla Destination.

Live reliability
7 working now none down

Stations · 17

98% working at Ohio · verified Jun 7, 2026

CANTON OH SDC

Cleveland Ave NW
Working
Non-Networked Level 2 88 ports NEMA 14-50
98% working

Fairfield Inn & Suites by Marriott Canton South - Tesla Destination

4025 Greentree Ave SW
Working
Tesla Destination Level 2 4 ports J1772 + Tesla
98% working

Hampton Inn - Canton

5256 Broadmoor Cir NW
Working
FCN DC Fast 4 ports CHAdeMO + CCS/SAE Combo
98% working

Pilot Travel Center 469

2320 Faircrest St
Working
eVgo Network DC Fast 4 ports CCS/SAE Combo
98% working

The Villas at Gervasi Vineyard - Tesla Destination

1700 55th St NE
Working
Tesla Destination Level 2 3 ports J1772 + Tesla
98% working

BLISS GARAGE BLISS DECK 3

238 Cleveland Ave NW
Working
ChargePoint Network Level 2 2 ports J1772
99% working

BLISS GARAGE BLISS DECK 1

238 Cleveland Ave NW
Working
ChargePoint Network Level 2 2 ports J1772
99% working

MAIN LOT 1 STARK MAIN 1

817 Market Ave N
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PLAIN TWP EV PLAINTWPADMIN2

2600 Easton St NE
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PLAIN TWP EV PLAINTWPADMIN1

2600 Easton St NE
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PLAIN TWP EV EV STATION VETS

1714 Schneider St NE
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Liberty Ford Canton

1423 Tuscarawas St W
Working
Non-Networked Level 2 2 ports J1772
98% working

CCFE AT HOFV

2014 Blake Ave NW
Working
ChargePoint Network Level 2 2 ports J1772
99% working

The Villas at Gervasi Vineyard

1700 55th St NE
Working
Non-Networked Level 2 1 port J1772
98% working

CITYOFCANTON E TUSCARAWAS 1

420 2nd St NW
Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo
99% working

CITYOFCANTON E TUSCARAWAS 2

420 2nd St NW
Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo
99% working

CHARGEMEAGAIN!! STATION1

1435 Cleveland Ave NW
Working
ChargePoint Network Level 2 1 port J1772
99% working
Home charging in Ohio costs 18.78¢/kWh — a full charge (60 kWh) costs about $11.27. Compare electricity prices →
All 17 stations active as of 2026-06-21 See full Ohio outage report →

Which EV Charging Networks Operate in Canton, OH?

Infrastructure Grade

8% DC Fast

Based on DC Fast Charger ratio

10 of 123 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 17
Ports per Station 7.2

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Canton, Ohio has 17 publicly accessible EV charging stations with 123 charging ports. ChargePoint Network operates 58.8% of stations in the area, followed by Non-Networked at 17.6% — part of Ohio's 2,071 stations statewide.

8% of ports (10) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 92% (113) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Ohio's EV infrastructure compares with Pennsylvania.

What Is the EV Charging Outlook for Canton?

Level 2 Focused Infrastructure

Canton's charging network emphasizes Level 2 charging (92% of ports), ideal for overnight and workplace charging.

Diverse Network Coverage

With 5 different charging networks available, EV drivers in Canton have excellent flexibility in choosing their preferred provider.

High-Capacity Stations

Charging stations in Canton average 7.2 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Canton?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Canton

2 hotels with on-site EV charging · 2 Tesla Destination · 7 Level 2 ports

Fairfield Inn & Suites by Marriott Canton South

⚡ Tesla

4025 Greentree Ave SW

🔌 4 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map

The Villas at Gervasi Vineyard

⚡ Tesla

1700 55th St NE

🔌 3 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map
"These results show we're moving in the right direction, but there's still work to do to ensure all EV drivers have access to reliable, welcoming public charging."

Joel Levin

Executive Director, Plug In America

Source: Plug In America (October 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.