12 EV Charging Stations in North Canton, OH

Locations, networks, and charger types — updated weekly from U.S. DOE data

12
Charging Stations

12 EV charging stations in North Canton — 6 ChargePoint Network, 2 Tesla Destination, 1 Non-Networked , 16 public DC fast chargers. Last updated May 9, 2026.

Where Are the 12 Charging Stations in North Canton?

GetGo - Tesla Supercharger

6215 Whipple Avenue NW
24 hours daily. Please check Tesla's online station map to see if an adapter is required at this location.
Tesla Gas Station
Tesla

Belden Park Crossings

5496 Dressler Road
24 hours daily
CCS/SAE Combo

Embassy Suites North Canton Airport

7883 Freedom Ave NW
24 hours daily; for guest use only
$0.40 per kWh
ENVIROSPARK Hotel
J1772 (Level 2)

Port Jackson Business Center

8310 Port Jackson Ave NW
24 hours daily; Drivers must bring their own J1772 cordset for Level 1 charging
Non-Networked Office Bldg
J1772 (Level 2) NEMA 14-50 Tesla

CAIN BMW STATION 01

6461 Whipple Ave NW
24 hours daily
J1772 (Level 2)

Courtyard by Marriott Canton - Tesla Destination

4375 Metro Cir NW
Tesla

Hilton Garden inn Akron/ Canton Airport - Tesla Destination

5251 Landmark Blvd
Tesla

CAK AIRPORT SHORT TERM 1-2

5400 Lauby Rd
24 hours daily
J1772 (Level 2)

MEGA LOT FRANK 1

6451 Frank Ave NW
24 hours daily
CHAdeMO (DC Fast) CCS/SAE Combo

MEGA LOT STARK STATE 2

6451 Frank Ave NW
24 hours daily
CHAdeMO (DC Fast) CCS/SAE Combo

CAKAP BMW CHARGING

5251 Landmark Blvd
24 hours daily
J1772 (Level 2)

CAKAP STATION - 1

5251 Landmark Blvd
24 hours daily
J1772 (Level 2)
All 12 stations active as of 2026-05-09 See full Ohio outage report →

Which EV Charging Networks Operate in North Canton, OH?

Infrastructure Grade

47% DC Fast

Based on DC Fast Charger ratio

16 of 34 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 12
Ports per Station 2.8

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, North Canton, Ohio has 12 publicly accessible EV charging stations with 34 charging ports. ChargePoint Network operates 50% of stations in the area, followed by Tesla Destination at 16.7% — part of Ohio's 2,069 stations statewide.

47% of ports (16) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 50% (17) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Ohio's EV infrastructure compares with Pennsylvania.

What Is the EV Charging Outlook for North Canton?

Strong Fast Charging Network

47% of charging ports in North Canton are DC fast chargers, providing good options for quick charging sessions.

Diverse Network Coverage

With 6 different charging networks available, EV drivers in North Canton have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near North Canton?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

🏨 Charge While You Stay — Hotels with EV Charging in North Canton

3 hotels with on-site EV charging · 2 Tesla Destination · 8 Level 2 ports

Embassy Suites North Canton Airport

Level 2

7883 Freedom Ave NW

🔌 4 ports · Public

Level 2: full charge (~200–300mi) in 8 hrs overnight

📍 View on Map

Courtyard by Marriott Canton

⚡ Tesla

4375 Metro Cir NW

🔌 2 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map

Hilton Garden inn Akron/ Canton Airport

⚡ Tesla

5251 Landmark Blvd

🔌 2 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map
"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."

Brent Gruber

Executive Director, EV Practice, J.D. Power

Source: J.D. Power 2025 Public Charging Study (August 2025)