Verified · Jun 21, 2026

No working DC fast chargers in Shelby yet

Just 3 Level 2 ports across Non-Networked, ChargePoint Network.

Live reliability
0 working now none down

Stations · 2

98% working at Ohio · verified Jun 7, 2026

SHELBY SHELBY EV

10 Water St
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Working
Non-Networked Level 2 1 port J1772
98% working
Home charging in Ohio costs 18.78¢/kWh — a full charge (60 kWh) costs about $11.27. Compare electricity prices →
All 2 stations active as of 2026-06-21 See full Ohio outage report →

Which EV Charging Networks Operate in Shelby, OH?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 3 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 2
Ports per Station 1.5

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Shelby, Ohio has 2 publicly accessible EV charging stations with 3 charging ports. Non-Networked operates 50% of stations in the area, followed by ChargePoint Network at 50% — part of Ohio's 2,071 stations statewide.

All 3 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 41 stations in nearby Akron, approximately 97 miles away. See how OH compares with Pennsylvania for broader regional context.

What Is the EV Charging Outlook for Shelby?

Level 2 Focused Infrastructure

Shelby's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

Where Else Can I Charge Near Shelby?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.