Verified · Jun 21, 2026

1 working DC fast charger in Rittman

All verified working this week, with 2 Level 2 ports across Non-Networked, EV Connect.

Live reliability
1 working now none down

Stations · 2

98% working at Ohio · verified Jun 7, 2026

Laria Chevrolet

112 E Ohio Ave
Working
Non-Networked Level 2 2 ports J1772
98% working

Premier GMC

2000 EASTERN RD
Working
EV Connect DC Fast 1 port CCS/SAE Combo
90% working
Home charging in Ohio costs 18.78¢/kWh — a full charge (60 kWh) costs about $11.27. Compare electricity prices →
All 2 stations active as of 2026-06-21 See full Ohio outage report →

Which EV Charging Networks Operate in Rittman, OH?

Infrastructure Grade

33% DC Fast

Based on DC Fast Charger ratio

1 of 3 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 2
Ports per Station 1.5

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Rittman, Ohio has 2 publicly accessible EV charging stations with 3 charging ports. Non-Networked operates 50% of stations in the area, followed by EV Connect at 50% — part of Ohio's 2,071 stations statewide.

33% of ports (1) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 67% (2) are Level 2 chargers suited for longer stops. Available connector types include CCS. Learn more in our EV charging levels guide. View national charging statistics for broader context.

Drivers needing more charging options can find 73 stations in nearby Cleveland, approximately 57 miles away. See how OH compares with Pennsylvania for broader regional context.

What Is the EV Charging Outlook for Rittman?

Strong Fast Charging Network

33% of charging ports in Rittman are DC fast chargers, providing good options for quick charging sessions.

Where Else Can I Charge Near Rittman?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.