Verified · Jun 21, 2026

No working DC fast chargers in Beacon yet

Just 39 Level 2 ports across ChargePoint Network, VIALYNK, EV Connect.

Live reliability
0 working now none down

Stations · 13

97% working at New York · verified Jun 7, 2026

The Lofts at Beacon

29 Mason Cir
Working
SWTCH Level 2 10 ports J1772
100% working

The Roundhouse

10 E Main Street
Working
VIALYNK Level 2 4 ports J1772
94% working

Dutchess Inn and Spa

151 Main St
Working
VIALYNK Level 2 4 ports J1772
94% working

SWTCH Energy

1 E Main St
Working
SWTCH Level 2 3 ports J1772
100% working

CITY OF BEACON STATION 1

1140 wolcott ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

CITY OF BEACON STATION 2

1 Municipal Plaza
Working
ChargePoint Network Level 2 2 ports J1772
99% working

NYS Bridge Authority - Newburgh-Beacon Bridge

105 Newburgh Beacon Way
Working
Non-Networked Level 2 2 ports J1772
98% working

Scenic Hudson's Long Dock Park

8 Long Dock Road
Working
EV Connect Level 2 2 ports J1772
90% working

Gateway to Mount Beacon

788 Wolcott Ave
Working
EV Connect Level 2 2 ports J1772
90% working

CITY OF BEACON CROSS ST.

7 Cross St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

CITY OF BEACON VAN NYDECK AVE

25 Van Nydeck Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

CITY OF BEACON WOLCOTT AVE 2

1140 Wolcott Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Beacon Center

223 Main St
Down
VIALYNK Level 2 2 ports J1772
94% working
Home charging in New York costs 28.55¢/kWh — a full charge (60 kWh) costs about $17.13. Compare electricity prices →
1 station reported unavailable as of 2026-06-21 See full New York outage report →

Which EV Charging Networks Operate in Beacon, NY?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 39 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 13
Ports per Station 3.0

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Beacon, New York has 13 publicly accessible EV charging stations with 39 charging ports. ChargePoint Network operates 38.5% of stations in the area, followed by VIALYNK at 23.1% — part of New York's 5,626 stations statewide.

All 39 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how New York's EV infrastructure compares with Massachusetts.

What Is the EV Charging Outlook for Beacon?

Level 2 Focused Infrastructure

Beacon's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

Diverse Network Coverage

With 5 different charging networks available, EV drivers in Beacon have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Beacon?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."

Brent Gruber

Executive Director, EV Practice, J.D. Power

Source: J.D. Power 2025 Public Charging Study (August 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.