Verified · Jun 21, 2026

8 working DC fast chargers in Troy

All verified working this week, with 126 Level 2 ports across ChargePoint Network, Non-Networked, RED_E.

Live reliability
8 working now none down

Stations · 60

97% working at Michigan · verified Jun 7, 2026

Kirts Blvd Troy

295 Kirts Blvd
Working
RED_E Level 2 13 ports J1772
96% working

Oakland Plaza (Troy, MI)

272 John R Rd
Working
Electrify America DC Fast 10 ports CCS/SAE Combo
98% working

Liberty Center Parking Garage

100 W Big Beaver Rd
Working
Non-Networked Level 2 8 ports Tesla
98% working

Lebanese Grill Troy

1600 Rochester Rd
Working
RED_E Level 2 4 ports J1772
96% working

Gallagher Kaiser

777 Chicago Rd
Working
Non-Networked Level 2 4 ports J1772
98% working

Somerset Collection Parking Garage

2800 W Big Beaver N
Working
Non-Networked Level 2 4 ports J1772
98% working

Neehee's Indian Vegetarian Street Food

4924 Rochester Rd
Working
Non-Networked Level 2 4 ports J1772
98% working
Working
Non-Networked Level 2 4 ports J1772
98% working

NeeHees Indian Restaurant Troy

4924 Rochester Rd
Working
RED_E Level 2 4 ports J1772
96% working

Cornerstone Community Credit Union

2138 E Big Beaver Rd
Working
RED_E Level 2 4 ports J1772
96% working
Working
RED_E Level 2 4 ports J1772
96% working

Suburban Nissan - Troy

1800 Maplelawn Dr
Working
Non-Networked DC Fast 2 ports J1772 + CCS/SAE Combo
98% working

900 TOWER 900 TOWER

900 Tower Dr
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Hilton Garden Inn Troy - Tesla Destination

200 Wilshire Dr
Working
Tesla Destination Level 2 2 ports Tesla
98% working

SOMERSETLEASING LEASING

1911 Golfview Drive
Down
ChargePoint Network Level 2 2 ports J1772
99% working

EMBASSY TROY STATION 1

850 Tower Dr
Down
ChargePoint Network Level 2 2 ports J1772
99% working

AUTOMATIONALLEY AUTOMATIONALLEY

2675 Bellingham Dr
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Schneider Electric

1975 Technology Dr
Working
Non-Networked Level 2 2 ports J1772
98% working

LG Electronics

1835 Technology Dr
Working
Non-Networked Level 2 2 ports J1772
98% working

BB's of Troy

4009 Livernois Rd
Working
Non-Networked Level 2 2 ports J1772
98% working
Home charging in Michigan costs 21.2¢/kWh — a full charge (60 kWh) costs about $12.72. Compare electricity prices →
4 stations reported unavailable as of 2026-06-21 — check before driving See full Michigan outage report →

Which EV Charging Networks Operate in Troy, MI?

Infrastructure Grade

10% DC Fast

Based on DC Fast Charger ratio

14 of 140 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 60
Ports per Station 2.3

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Troy, Michigan has 60 publicly accessible EV charging stations with 140 charging ports. ChargePoint Network operates 61.7% of stations in the area, followed by Non-Networked at 21.7% — part of Michigan's 2,139 stations statewide.

10% of ports (14) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 90% (126) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Michigan's EV infrastructure compares with Ohio.

What Is the EV Charging Outlook for Troy?

Level 2 Focused Infrastructure

Troy's charging network emphasizes Level 2 charging (90% of ports), ideal for overnight and workplace charging.

Diverse Network Coverage

With 6 different charging networks available, EV drivers in Troy have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Troy?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Troy

1 hotel with on-site EV charging · 1 Tesla Destination · 2 Level 2 ports

Hilton Garden Inn Troy

⚡ Tesla

200 Wilshire Dr

🔌 2 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map
"Overall charger utilization is really moving up and to the right. It's growing much faster than charger installations are growing."

Rick Wilmer

President & CEO, ChargePoint

Source: ABC News / AP (March 2024)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.