Latest reported · Aug 10, 2026

3 working DC-fast stations in Owosso

All verified working this week, with 19 Level 2 ports across ChargePoint Network, Non-Networked, FLO.

Latest reported availability
3 working now none down

Active charging locations · 5

98% working at Michigan · verified Aug 10, 2026

Showing 5 useful public-access records selected from 5 active locations. Counts distinguish locations from 25 ports and 9 connector-type records; availability is periodically refreshed, not live.

MAIN ST PLAZA MAIN ST PLAZA 1

113 W Main St
Working
ChargePoint Network DC Fast 1 port CCS/SAE Combo + Tesla

MAIN ST PLAZA MAIN ST PLAZA 2

113 W Main St
Working
ChargePoint Network DC Fast 1 port CCS/SAE Combo + Tesla

Lunghamer Ford Owosso

1960 E Main St
Working
RED_E DC Fast 8 ports J1772 + CCS/SAE Combo

Memorial Healthcare Hospital Employee Lot

826 W King St
Working
Non-Networked Level 2 7 ports J1772 + Tesla

Memorial Healthcare Wellness Center

819 N. Shiawassee
Working
FLO Level 2 8 ports J1772

Local charging snapshot

Owosso charging basics

5 public stations with 25 charging ports. 6 DC fast ports (24%) for quicker stops , plus 19 Level 2 ports (76%) for longer stays.

AFDC data last synced August 10, 2026.

5
stations
25
ports
6
DC fast
19
Level 2
Charging costs and cheapest hours in Owosso
Home charging costs
Compare Michigan electricity prices →

Cheapest time to charge today

The cheapest, greenest grid window in Owosso today is 1 AM – 4 AM CDT, based on MISO day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.

Nearby city charging pages around Owosso

EV charging questions for Owosso

Which EV charging networks operate in Owosso, MI?

Owosso has 4 charging networks. ChargePoint Network operates 40% of stations, serving 5 total stations.

What is the EV charging outlook for Owosso?

24% of Owosso's charging ports are DC fast chargers and 76% are Level 2.

When is the cheapest time to charge an EV in Owosso?

Today's cheapest, greenest grid window in Owosso is 1 AM – 4 AM CDT, based on MISO day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Dataset snapshot: August 10, 2026. Availability is periodically refreshed.