Questions about EV charging?

Latest reported · Nov 9, 2026

3 working DC-fast stations in Howell

All verified working this week, with 9 Level 2 ports across RED_E, ChargePoint Network, eVgo Network.

Latest reported availability
3 working now none down

Charging around Howell, MI

Tap a dot for a station, or pick your car to see which stations fit. Dots in the surrounding area open that place's page.

Map of Howell charging stations
The interactive map loads as you scroll here. Every station is also listed below.
Loading map…

Active charging locations · 7

98% working at Michigan · verified Nov 9, 2026

Showing 7 useful public-access records selected from 7 active locations. Counts distinguish locations from 25 ports and 8 connector-type records; availability is periodically refreshed, not live.

Getting there

Getting into Howell

West · E Grand River Ave
2 stations · closest 2.3 km from downtown
Bob Maxey Ford of Howell· 4 DC fast + 2 Level 2
Southwest · Grand Oaks Dr
2 stations · closest 2 km from downtown

Bob Maxey Ford of Howell

2798 E Grand River Ave

Bob Maxey Ford of Howell on E Grand River Ave has 4 DC fast ports (J1772, CCS) on the RED_E network.

Working
RED_E DC Fast 6 ports J1772 + CCS/SAE Combo

Kensington Valley Outlets

1475 N Burkart Rd

Kensington Valley Outlets on N Burkart Rd has 10 DC fast ports (CCS) on the eVgo Network, open 24/7.

Working
eVgo Network DC Fast 10 ports CCS/SAE Combo

Shell Howell

3990 Grand Oaks Dr

Shell Howell on Grand Oaks Dr has 2 DC fast ports (CCS) on the RED_E network.

Working
RED_E DC Fast 2 ports CCS/SAE Combo

CONSUMERSENERGY HOW-EVSE-1

1000 Grand Oaks Drive

Consumersenergy How-Evse-1 on Grand Oaks Dr has 1 Level 2 port on the ChargePoint Network, open 24/7.

Working
ChargePoint Network Level 2 1 port J1772

CONSUMERSENERGY HOW-EVSE-2

1000 Grand Oaks Dr

Consumersenergy How-Evse-2 on Grand Oaks Dr has 1 Level 2 port on the ChargePoint Network, open 24/7.

Working
ChargePoint Network Level 2 1 port J1772

Waldenwoods Resort and Conference Center

2975 Old US 23

Waldenwoods Resort and Conference Center on Old Us 23 has 3 Level 2 ports on the RED_E network.

Working
RED_E Level 2 3 ports J1772

Howell N State St Municipal Parking

200 E Grand River Ave

Howell N State St Municipal Parking on E Grand River Ave has 2 Level 2 ports on the RED_E network.

Working
RED_E Level 2 2 ports J1772

Local charging snapshot

Howell charging basics

7 public stations with 25 charging ports. 16 DC fast ports (64%) for quicker stops , plus 9 Level 2 ports (36%) for longer stays.

AFDC data last synced November 9, 2026.

7
stations
25
ports
16
DC fast
9
Level 2
Charging costs and cheapest hours in Howell
Home charging costs
Compare Michigan electricity prices →

Cheapest time to charge today

The cheapest, greenest grid window in Howell today is 11 AM – 2 PM CST, based on MISO day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.

Nearby city charging pages around Howell

EV charging questions for Howell

Which EV charging networks operate in Howell, MI?

Howell has 3 charging networks. RED_E operates 57.1% of stations, serving 7 total stations.

What is the EV charging outlook for Howell?

64% of Howell's charging ports are DC fast chargers and 36% are Level 2.

When is the cheapest time to charge an EV in Howell?

Today's cheapest, greenest grid window in Howell is 11 AM – 2 PM CST, based on MISO day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Dataset snapshot: November 9, 2026. Availability is periodically refreshed.