Latest reported · Aug 10, 2026

1 working DC-fast station in Medfield

All verified working this week, with 8 Level 2 ports across FLO, Electrify America, ChargePoint Network.

Latest reported availability
1 working now none down

Active charging locations · 5

98% working at Massachusetts · verified Aug 10, 2026

Showing 5 useful public-access records selected from 5 active locations. Counts distinguish locations from 12 ports and 5 connector-type records; availability is periodically refreshed, not live.

BOA Medfield MA6-277 (Medfield, MA)

478 Main St
Working
Electrify America DC Fast 4 ports CCS/SAE Combo

Medfield | 459 Main Street

459 Main Street
Working
FLO Level 2 2 ports J1772

LANECO LEVITON 2

50 Peter Kristof Way
Working
ChargePoint Network Level 2 2 ports J1772

Medfield | 17 Elm Street

17 Elm Street
Working
FLO Level 2 2 ports J1772

Medfield | 24 Pound Street

24 Pound Street
Working
FLO Level 2 2 ports J1772

Local charging snapshot

Medfield charging basics

5 public stations with 12 charging ports. 4 DC fast ports (33%) for quicker stops , plus 8 Level 2 ports (67%) for longer stays.

AFDC data last synced August 10, 2026.

5
stations
12
ports
4
DC fast
8
Level 2
Charging costs and cheapest hours in Medfield
Home charging costs
Compare Massachusetts electricity prices →

Cheapest time to charge today

The cheapest, greenest grid window in Medfield today is 2 AM – 5 AM EDT, based on ISO New England day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.

Nearby city charging pages around Medfield

EV charging questions for Medfield

Which EV charging networks operate in Medfield, MA?

Medfield has 3 charging networks. FLO operates 60% of stations, serving 5 total stations.

What is the EV charging outlook for Medfield?

33% of Medfield's charging ports are DC fast chargers and 67% are Level 2.

When is the cheapest time to charge an EV in Medfield?

Today's cheapest, greenest grid window in Medfield is 2 AM – 5 AM EDT, based on ISO New England day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Dataset snapshot: August 10, 2026. Availability is periodically refreshed.