Verified · Jun 21, 2026

2 working DC fast chargers in Chestnut Hill

All verified working this week, with 3 Level 2 ports across Tesla, eVgo Network, EV Connect.

Live reliability
2 working now none down

Stations · 4

99% working at Massachusetts · verified Jun 7, 2026
Working
Tesla DC Fast 12 ports Tesla
98% working

The Street Chestnut Hill - Tesla Supercharger

55 Boylston Street
Working
Tesla DC Fast 8 ports Tesla
98% working

Shops at Chestnut Hill

199 Boylston St
Working
eVgo Network DC Fast 3 ports CHAdeMO + J1772
98% working

Towers of Chestnut Hill

250 Hammond Pond Pkwy
Working
EV Connect Level 2 2 ports J1772
90% working
Home charging in Massachusetts costs 30.21¢/kWh — a full charge (60 kWh) costs about $18.13. Compare electricity prices →
All 4 stations active as of 2026-06-21 See full Massachusetts outage report →

Which EV Charging Networks Operate in Chestnut Hill, MA?

Infrastructure Grade

88% DC Fast

Based on DC Fast Charger ratio

22 of 25 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 4
Ports per Station 6.3

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Chestnut Hill, Massachusetts has 4 publicly accessible EV charging stations with 25 charging ports. Tesla operates 50% of stations in the area, followed by eVgo Network at 25% — part of Massachusetts's 4,577 stations statewide.

88% of ports (22) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 12% (3) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our Tesla Supercharger network. View national charging statistics for broader context.

For regional context, see how Massachusetts's EV infrastructure compares with New York.

What Is the EV Charging Outlook for Chestnut Hill?

High-Speed Charging Hub

Chestnut Hill has exceptional DC fast charging coverage with 88% of ports being high-speed chargers, well above the national average.

High-Capacity Stations

Charging stations in Chestnut Hill average 6.3 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Chestnut Hill?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"City-to-city differences in climate, travel patterns, housing, charging preferences, and demographics aren't considerations captured in other infrastructure assessments. Making that data publicly available will prove pivotal as cities work to determine their network needs."

Eric Wood

Senior Researcher, National Renewable Energy Laboratory

Source: NREL (June 2023)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.