Verified · Jun 21, 2026

4 working DC fast chargers in Burlington

All verified working this week, with 91 Level 2 ports across ChargePoint Network, Non-Networked, Electrify America.

Live reliability
4 working now none down

Stations · 47

99% working at Massachusetts · verified Jun 7, 2026

Burlington Mall - Tesla Supercharger

75 Middlesex Turnpike
Working
Tesla DC Fast 12 ports Tesla
98% working

SWTCH Energy

200 Summit Dr
Working
SWTCH Level 2 9 ports J1772
100% working

Albertsons Burlington #0495

180 A Cambridge Street
Working
eVgo Network DC Fast 6 ports CCS/SAE Combo
98% working
Working
Electrify America DC Fast 4 ports J1772 + CCS/SAE Combo
98% working

TOWN HALL 1 TOWN HALL 1

1 Dearborn Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

WTP 10 CORPORATE DR

10 Corporate Dr
Working
ChargePoint Network Level 2 2 ports J1772
99% working

STATION 1 MARRIOTT BURL

1 Burlington Mall Road
Working
ChargePoint Network Level 2 2 ports J1772
99% working

THE CENTER STATION 1

25 Corporate Dr
Working
ChargePoint Network Level 2 2 ports J1772
99% working

LHMC GARAGE LV2 #4

41 Burlington Mall Road
Working
ChargePoint Network Level 2 2 ports J1772
99% working

LHMC GARAGE LV2 #3

Lahey Clinic
Working
ChargePoint Network Level 2 2 ports J1772
99% working

LHMC GARAGE LV2 #2

Lahey
Working
ChargePoint Network Level 2 2 ports J1772
99% working

LHMC GARAGE LV1 #4

41 Burlington Mall Road
Working
ChargePoint Network Level 2 2 ports J1772
99% working

LHMC GARAGE LV1 #1

41 Burlington Mall Road
Working
ChargePoint Network Level 2 2 ports J1772
99% working

LHMC GARAGE LV1 #3

41 Burlington Mall Road
Working
ChargePoint Network Level 2 2 ports J1772
99% working

LHMC GARAGE LV2 #1

41 Burlington Mall Road
Working
ChargePoint Network Level 2 2 ports J1772
99% working

LHMC GARAGE LV1 #2

41 Burlington Mall Road
Working
ChargePoint Network Level 2 2 ports J1772
99% working

FAA - Regional Office Building (ANE)

1200 District Ave #3
Working
Non-Networked Level 2 2 ports J1772
98% working

LHMC LOT 3 LAHEY 1

67 S Bedford St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

LHMC LOT 3 LAHEY 2

41 Burlington Mall Road
Working
ChargePoint Network Level 2 2 ports J1772
99% working

LHMC LOT 8 LAHEY #2

67 S Bedford St
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Home charging in Massachusetts costs 30.21¢/kWh — a full charge (60 kWh) costs about $18.13. Compare electricity prices →
All 47 stations active as of 2026-06-21 See full Massachusetts outage report →

Which EV Charging Networks Operate in Burlington, MA?

Infrastructure Grade

20% DC Fast

Based on DC Fast Charger ratio

23 of 114 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 47
Ports per Station 2.4

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Burlington, Massachusetts has 47 publicly accessible EV charging stations with 114 charging ports. ChargePoint Network operates 87.2% of stations in the area, followed by Non-Networked at 4.3% — part of Massachusetts's 4,577 stations statewide.

20% of ports (23) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 80% (91) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS). Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Massachusetts's EV infrastructure compares with New York.

What Is the EV Charging Outlook for Burlington?

Diverse Network Coverage

With 6 different charging networks available, EV drivers in Burlington have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Burlington?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."

Brent Gruber

Executive Director, EV Practice, J.D. Power

Source: J.D. Power 2025 Public Charging Study (August 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.