10 working DC fast chargers in Seguin
All verified working this week, with 3 Level 2 ports across ChargePoint Network, Tesla Destination, Electrify America.
Stations · 7
La Quinta Inn (Seguin, TX)
1501 N State Highway 46Holiday inn Express and Suites Seguin - Tesla Destination
2801 Jay RdHALFTIME 3 STATION 2
101 Meadow Lake DriveHALFTIME 3 STATION 1
101 Meadow Lake DriveWhich EV Charging Networks Operate in Seguin, TX?
Infrastructure Grade
80% DC Fast
Based on DC Fast Charger ratio
12 of 15 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Jun 24, 2026
Data sourced from U.S. DOE AFDC
As of June 2026, Seguin, Texas has 7 publicly accessible EV charging stations with 15 charging ports. ChargePoint Network operates 57.1% of stations in the area, followed by Tesla Destination at 14.3% — part of Texas's 3,983 stations statewide.
80% of ports (12) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 20% (3) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.
For regional context, see how Texas's EV infrastructure compares with New Mexico.
What Is the EV Charging Outlook for Seguin?
High-Speed Charging Hub
Seguin has exceptional DC fast charging coverage with 80% of ports being high-speed chargers, well above the national average.
Where Else Can I Charge Near Seguin?
Austin, Texas
San Antonio, Texas
San Marcos, Texas
Kyle, Texas
Boerne, Texas
New Braunfels, Texas
Bastrop, Texas
Dripping Springs, Texas
Wimberley, Texas
Johnson City, Texas
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: June 21, 2026
🏨 Charge While You Stay — Hotels with EV Charging in Seguin
1 hotel with on-site EV charging · 1 Tesla Destination · 3 Level 2 ports
Holiday inn Express and Suites Seguin
⚡ Tesla2801 Jay Rd
Tesla Destination: full charge in 6–10 hrs overnight
📍 View on Map"City-to-city differences in climate, travel patterns, housing, charging preferences, and demographics aren't considerations captured in other infrastructure assessments. Making that data publicly available will prove pivotal as cities work to determine their network needs."