11 EV Charging Stations in Baytown, TX
Locations, networks, and charger types — updated weekly from U.S. DOE data
11 EV charging stations in Baytown — 6 ChargePoint Network, 3 Tesla, 1 Tesla Destination , 32 public DC fast chargers. Last updated May 9, 2026.
Where Are the 11 Charging Stations in Baytown?
Which EV Charging Networks Operate in Baytown, TX?
Infrastructure Grade
68% DC Fast
Based on DC Fast Charger ratio
32 of 47 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Baytown, Texas has 11 publicly accessible EV charging stations with 47 charging ports. ChargePoint Network operates 54.5% of stations in the area, followed by Tesla at 27.3% — part of Texas's 4,003 stations statewide.
68% of ports (32) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 32% (15) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS). Learn more in our ChargePoint network. View national charging statistics for broader context.
For regional context, see how Texas's EV infrastructure compares with New Mexico.
What Is the EV Charging Outlook for Baytown?
High-Speed Charging Hub
Baytown has exceptional DC fast charging coverage with 68% of ports being high-speed chargers, well above the national average.
High-Capacity Stations
Charging stations in Baytown average 4.3 ports each, reducing wait times and improving charging accessibility.
Where Else Can I Charge Near Baytown?
Houston, Texas
Katy, Texas
Spring, Texas
Galveston, Texas
Conroe, Texas
Humble, Texas
Sugar Land, Texas
Stafford, Texas
League City, Texas
Tomball, Texas
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
🏨 Charge While You Stay — Hotels with EV Charging in Baytown
1 hotel with on-site EV charging · 1 Tesla Destination · 3 Level 2 ports
Baymont Inn & Suites Baytown
⚡ Tesla7212 E Point Blvd
Tesla Destination: full charge in 6–10 hrs overnight
📍 View on Map"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."
Brent Gruber
Executive Director, EV Practice, J.D. Power
Source: J.D. Power 2025 Public Charging Study (August 2025)