Verified · Jun 21, 2026

No working DC fast chargers in North Kingstown yet

Just 32 Level 2 ports across ChargePoint Network, Non-Networked, AMPUP.

Live reliability
0 working now none down

Stations · 9

100% working at Rhode Island · verified Jun 7, 2026

Wickford Junction Commuter Rail Station

1051 Ten Rod Rd
Working
Non-Networked Level 2 30 ports J1772 + NEMA 5-20
98% working

North Kingstown Golf Course

615 Callahan Rd
Working
AMPUP Level 2 8 ports J1772
98% working

RI OER WICKTRAINST5

1011 Ten Rod Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

RI OER WICKTRAINST4

1011 Ten Rod Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

RI OER WICKTRAINST3

1011 Ten Rod Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

RI OER WICKTRAINST2

1011 Ten Rod Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

RI OER WICKTRAINST1

1011 Ten Rod Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Working
NOODOE Level 2 2 ports J1772
98% working

AMPCAP KOHLS KINGSTON

20 Gate Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Home charging in Rhode Island costs 29.91¢/kWh — a full charge (60 kWh) costs about $17.95. Compare electricity prices →
All 9 stations active as of 2026-06-14 See full Rhode Island outage report →

Which EV Charging Networks Operate in North Kingstown, RI?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 52 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 9
Ports per Station 5.8

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, North Kingstown, Rhode Island has 9 publicly accessible EV charging stations with 52 charging ports. ChargePoint Network operates 66.7% of stations in the area, followed by Non-Networked at 11.1% — part of Rhode Island's 372 stations statewide.

All 52 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Rhode Island's EV infrastructure compares with Massachusetts.

What Is the EV Charging Outlook for North Kingstown?

Level 2 Focused Infrastructure

North Kingstown's charging network emphasizes Level 2 charging (62% of ports), ideal for overnight and workplace charging.

ChargePoint Network Stronghold

ChargePoint Network leads the market in North Kingstown with 67% of stations, making their membership particularly valuable here.

High-Capacity Stations

Charging stations in North Kingstown average 5.8 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near North Kingstown?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"City-to-city differences in climate, travel patterns, housing, charging preferences, and demographics aren't considerations captured in other infrastructure assessments. Making that data publicly available will prove pivotal as cities work to determine their network needs."

Eric Wood

Senior Researcher, National Renewable Energy Laboratory

Source: NREL (June 2023)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.