Verified · Jun 21, 2026

4 working DC fast chargers in Silverton

All verified working this week, with 13 Level 2 ports across OpConnect, ChargePoint Network, Tesla Destination.

Live reliability
4 working now none down

Stations · 13

99% working at Oregon · verified Jun 7, 2026

The Oregon Garden Resort - Tesla Destination

895 W Main St
Working
Tesla Destination Level 2 2 ports J1772 + Tesla
98% working

PGE ROTHS L2

806 N 1st St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PGE ROTHS DCFC 1

806 N 1st St
Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo
99% working

PGE ROTHS DCFC 2

806 N 1st St
Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo
99% working

434 S 2nd St, Silverton

434 South 2nd St
Working
OpConnect Level 2 1 port J1772
98% working

904 S Water St, Silverton

904 S Water St
Working
OpConnect Level 2 1 port J1772
98% working

231 Fairview St, Silverton

231 Fairview St
Working
OpConnect Level 2 1 port J1772
98% working

706 N Water St, Silverton

706 N Water St
Working
OpConnect Level 2 1 port J1772
98% working

246 Coolidge St, Silverton

246 Coolidge St
Working
OpConnect Level 2 1 port J1772
98% working

241 Mill St, Silverton

241 Mill St
Working
OpConnect Level 2 1 port J1772
98% working

223 Mill St, Silverton

223 Mill St
Working
OpConnect Level 2 1 port J1772
98% working

404 S 3rd St, Silverton

404 S 3rd St
Working
OpConnect Level 2 1 port J1772
98% working

510 E Main St, Silverton

510 E Main St
Working
OpConnect Level 2 1 port J1772
98% working
Home charging in Oregon costs 14.89¢/kWh — a full charge (60 kWh) costs about $8.93. Compare electricity prices →
All 13 stations active as of 2026-06-21 See full Oregon outage report →

Which EV Charging Networks Operate in Silverton, OR?

Infrastructure Grade

13% DC Fast

Based on DC Fast Charger ratio

2 of 15 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 13
Ports per Station 1.2

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Silverton, Oregon has 13 publicly accessible EV charging stations with 15 charging ports. OpConnect operates 69.2% of stations in the area, followed by ChargePoint Network at 23.1% — part of Oregon's 1,764 stations statewide.

13% of ports (2) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 87% (13) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our EV connector types guide. View national charging statistics for broader context.

For regional context, see how Oregon's EV infrastructure compares with California.

What Is the EV Charging Outlook for Silverton?

Level 2 Focused Infrastructure

Silverton's charging network emphasizes Level 2 charging (87% of ports), ideal for overnight and workplace charging.

OpConnect Stronghold

OpConnect leads the market in Silverton with 69% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Silverton?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Silverton

1 hotel with on-site EV charging · 1 Tesla Destination · 2 Level 2 ports

The Oregon Garden Resort

⚡ Tesla

895 W Main St

🔌 2 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map
"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."

Brent Gruber

Executive Director, EV Practice, J.D. Power

Source: J.D. Power 2025 Public Charging Study (August 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.