3 EV Charging Stations in Water Mill, NY
Locations, networks, and charger types — updated weekly from U.S. DOE data
3 EV charging stations in Water Mill — 1 Tesla Destination, 1 ChargePoint Network, 1 Tesla , 9 public DC fast chargers. Last updated May 9, 2026.
Where Are the 3 Charging Stations in Water Mill?
Which EV Charging Networks Operate in Water Mill, NY?
Infrastructure Grade
82% DC Fast
Based on DC Fast Charger ratio
9 of 11 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Water Mill, New York has 3 publicly accessible EV charging stations with 11 charging ports. Tesla Destination operates 33.3% of stations in the area, followed by ChargePoint Network at 33.3% — part of New York's 5,508 stations statewide.
82% of ports (9) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 18% (2) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our Tesla Supercharger network. View national charging statistics for broader context.
Drivers needing more charging options can find 138 stations in nearby New Haven, approximately 65 miles away. See how NY compares with Massachusetts for broader regional context.
What Is the EV Charging Outlook for Water Mill?
High-Speed Charging Hub
Water Mill has exceptional DC fast charging coverage with 82% of ports being high-speed chargers, well above the national average.
Competitive Charging Market
No single network dominates Water Mill, with 3 providers competing to offer the best charging experience.
Where Else Can I Charge Near Water Mill?
New Haven, Connecticut
Hartford, Connecticut
East Hartford, Connecticut
Bristol, Connecticut
New London, Connecticut
New Britain, Connecticut
Waterbury, Connecticut
Groton, Connecticut
Middletown, Connecticut
Milford, Connecticut
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
🏨 Charge While You Stay — Hotels with EV Charging in Water Mill
1 hotel with on-site EV charging · 1 Tesla Destination · 2 Level 2 ports
White Fences Inn Water Mill
⚡ Tesla371 Montauk Hwy
Tesla Destination: full charge in 6–10 hrs overnight
📍 View on Map"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."