13 EV Charging Stations in Upton, NY
Locations, networks, and charger types — updated weekly from U.S. DOE data
13 EV charging stations in Upton — 13 Non-Networked . Last updated May 9, 2026.
Where Are the 13 Charging Stations in Upton?
Which EV Charging Networks Operate in Upton, NY?
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 38 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Upton, New York has 13 publicly accessible EV charging stations with 38 charging ports. Non-Networked operates 100% of stations in the area — part of New York's 5,508 stations statewide.
All 38 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.
For regional context, see how New York's EV infrastructure compares with Massachusetts.
What Is the EV Charging Outlook for Upton?
Level 2 Focused Infrastructure
Upton's charging network emphasizes Level 2 charging (79% of ports), ideal for overnight and workplace charging.
Non-Networked Stronghold
Non-Networked leads the market in Upton with 100% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Upton?
New York, New York
Brooklyn, New York
New Haven, Connecticut
Haverstraw, New York
Bristol, Connecticut
Queens, New York
Stamford, Connecticut
Yonkers, New York
New London, Connecticut
White Plains, New York
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."
Brent Gruber
Executive Director, EV Practice, J.D. Power
Source: J.D. Power 2025 Public Charging Study (August 2025)