Verified · Jun 21, 2026

4 working DC fast chargers in East Greenbush

All verified working this week, with 84 Level 2 ports across ChargePoint Network, VIALYNK, AMPUP.

Live reliability
4 working now none down

Stations · 20

97% working at New York · verified Jun 7, 2026

Regeneron Building 47 Parking Garage

Tempel Ln
Working
AMPUP Level 2 12 ports J1772
98% working

Horizon Ridge - North

100 Horizon View
Down
VIALYNK Level 2 12 ports J1772
94% working

Forrest Pointe - South

1 Forrest Pointe Drive
Working
VIALYNK Level 2 8 ports J1772
94% working

Forrest Pointe - North

1 Forrest Pointe Dr.
Working
VIALYNK Level 2 8 ports J1772
94% working

Horizon Ridge - South

100 Horizon View
Working
VIALYNK Level 2 8 ports J1772
94% working

Mill Creek - B

16 Mill Creek Drive
Working
VIALYNK Level 2 8 ports J1772
94% working

Mill Creek - A

16 Mill Creek Drive
Working
VIALYNK Level 2 8 ports J1772
94% working

Hampton Inn - East Greenbush

25 Hampton Inn Drive,
Working
CHARGESMART_EV DC Fast 8 ports CCS/SAE Combo + Tesla
98% working

Hannaford Plaza - East Greenbush

598 Columbia Tpke
Working
eVgo Network DC Fast 6 ports CHAdeMO + CCS/SAE Combo
98% working

Wallys Ford of East Greenbush

634 Columbia Turnpike
Working
FORD_CHARGE DC Fast 4 ports CCS/SAE Combo
98% working

HAWTHORNE RIDGE STATION 2

30 Community Way Hawthorne Ridge
Working
ChargePoint Network Level 2 2 ports J1772
99% working

HAWTHORNE RIDGE STATION 1

30 Community Way Hawthorne Ridge
Working
ChargePoint Network Level 2 2 ports J1772
99% working

REGENERON EV-TL-17-01

Tempel Ln
Working
ChargePoint Network Level 2 2 ports J1772
99% working

REGENERON EV-TL-17-03

Tempel Ln
Working
ChargePoint Network Level 2 2 ports J1772
99% working

REGENERON EV-TL-17-02

Tempel Ln
Working
ChargePoint Network Level 2 2 ports J1772
99% working

REGENERON EV-TL-47-02

Tempel Ln
Working
ChargePoint Network Level 2 2 ports J1772
99% working

REGENERON EV-TL-47-01

Tempel Ln
Working
ChargePoint Network Level 2 2 ports J1772
99% working

REGENERON EV-TV-26-03

26 Tech Valley Dr
Working
ChargePoint Network Level 2 2 ports J1772
99% working

REGENERON EV-TV-26-02

26 Tech Valley Dr
Working
ChargePoint Network Level 2 2 ports J1772
99% working

REGENERON EV-TV-26-01

26 Tech Valley Dr
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Home charging in New York costs 28.55¢/kWh — a full charge (60 kWh) costs about $17.13. Compare electricity prices →
1 station reported unavailable as of 2026-06-21 See full New York outage report →

Which EV Charging Networks Operate in East Greenbush, NY?

Infrastructure Grade

18% DC Fast

Based on DC Fast Charger ratio

18 of 102 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 20
Ports per Station 5.1

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, East Greenbush, New York has 20 publicly accessible EV charging stations with 102 charging ports. ChargePoint Network operates 50% of stations in the area, followed by VIALYNK at 30% — part of New York's 5,626 stations statewide.

18% of ports (18) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 82% (84) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how New York's EV infrastructure compares with Massachusetts.

What Is the EV Charging Outlook for East Greenbush?

Diverse Network Coverage

With 6 different charging networks available, EV drivers in East Greenbush have excellent flexibility in choosing their preferred provider.

High-Capacity Stations

Charging stations in East Greenbush average 5.1 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near East Greenbush?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."

Brent Gruber

Executive Director, EV Practice, J.D. Power

Source: J.D. Power 2025 Public Charging Study (August 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.