Verified · Jun 21, 2026

4 working DC fast chargers in Schenectady

All verified working this week, with 269 Level 2 ports across ChargePoint Network, VIALYNK, CHARGESMART_EV.

Live reliability
4 working now none down

Stations · 67

97% working at New York · verified Jun 7, 2026

The Daily Gazette

2345 Maxon Rd Ext
Working
VIALYNK Level 2 16 ports J1772
94% working

Schenectady County - 388 Broadway

388 Broadway
Working
VIALYNK Level 2 10 ports J1772
94% working

Liberty Street

105 Jay St
Working
VIALYNK Level 2 10 ports J1772
94% working

Rotterdam Mall

93 W Campbell Rd
Working
VIALYNK Level 2 10 ports J1772
94% working

Wellington Gardens

24 W. Campbell Rd
Working
VIALYNK Level 2 10 ports J1772
94% working

SWTCH Energy Inc.

1275 Gerling St
Working
SWTCH Level 2 10 ports J1772
100% working

Quality Inn Schenectady - Albany

2788 Hamburg St
Working
CHARGESMART_EV Level 2 10 ports J1772
98% working

SUNY Schenectady - Main Lot Student

78 Washington Ave
Working
VIALYNK Level 2 8 ports J1772
94% working

SWTCH Energy Inc.

1275 Gerling St W
Working
SWTCH Level 2 8 ports J1772
100% working

SWTCH Energy Inc.

2150 Rosa Rd
Working
SWTCH Level 2 8 ports J1772
100% working

Metro Ford

3601 State St
Working
CHARGESMART_EV DC Fast 8 ports J1772 + CCS/SAE Combo
98% working

Schenectady County - 420 Broadway

420 Broadway
Working
VIALYNK Level 2 6 ports J1772
94% working

SUNY Schenectady - Center for Science and Technology

78 Washington Ave
Working
VIALYNK Level 2 6 ports J1772
94% working

SUNY Schenectady - Main Lot Faculty

78 Washington Ave
Working
VIALYNK Level 2 6 ports J1772
94% working

SUNY Schenectady - School of Music

78 Washington Ave
Working
VIALYNK Level 2 6 ports J1772
94% working

Mohawk Honda Collision Center Outside

25 Saratoga Rd
Working
VIALYNK Level 2 6 ports J1772
94% working

122 South Church St.

122 South Church St
Working
VIALYNK Level 2 6 ports J1772
94% working

Crosstown Plaza

2330 Watt St
Working
eVgo Network DC Fast 6 ports CHAdeMO + CCS/SAE Combo
98% working

JCC of Schenectady

2565 Balltown Rd
Working
CHARGESMART_EV Level 2 6 ports J1772
98% working

LAZ Parking

220 Broadway St
Working
CHARGESMART_EV Level 2 6 ports J1772
98% working
Home charging in New York costs 28.55¢/kWh — a full charge (60 kWh) costs about $17.13. Compare electricity prices →
4 stations reported unavailable as of 2026-06-21 — check before driving See full New York outage report →

Which EV Charging Networks Operate in Schenectady, NY?

Infrastructure Grade

4% DC Fast

Based on DC Fast Charger ratio

10 of 279 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 67
Ports per Station 4.2

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Schenectady, New York has 67 publicly accessible EV charging stations with 279 charging ports. ChargePoint Network operates 38.8% of stations in the area, followed by VIALYNK at 37.3% — part of New York's 5,626 stations statewide.

4% of ports (10) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 96% (269) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how New York's EV infrastructure compares with Massachusetts.

What Is the EV Charging Outlook for Schenectady?

Level 2 Focused Infrastructure

Schenectady's charging network emphasizes Level 2 charging (96% of ports), ideal for overnight and workplace charging.

Diverse Network Coverage

With 8 different charging networks available, EV drivers in Schenectady have excellent flexibility in choosing their preferred provider.

High-Capacity Stations

Charging stations in Schenectady average 4.2 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Schenectady?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"We are putting in charging stations where people are, where people are running errands. They're going grocery shopping, they go to work. That's where we put our charging stations."

Badar Khan

CEO, EVgo

Source: Yahoo Finance (March 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.