1 EV Charging Stations in Cortlandt, NY

Locations, networks, and charger types — updated weekly from U.S. DOE data

1
Charging Stations

1 EV charging stations in Cortlandt — 1 FLO . Last updated May 9, 2026.

Where Are the 1 Charging Stations in Cortlandt?

Blue Mountain Sportsman Center

183 Watch Hill Road
24 hours daily
FLO
J1772 (Level 2)
All 1 stations active as of 2026-05-09 See full New York outage report →

Which EV Charging Networks Operate in Cortlandt, NY?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 9 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 9.0

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, Cortlandt, New York has 1 publicly accessible EV charging station with 9 charging ports. FLO operates 100% of stations in the area — part of New York's 5,508 stations statewide.

All 9 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 440 stations in nearby New York, approximately 55 miles away. See how NY compares with Massachusetts for broader regional context.

What Is the EV Charging Outlook for Cortlandt?

Level 2 Focused Infrastructure

Cortlandt's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

FLO Stronghold

FLO leads the market in Cortlandt with 100% of stations, making their membership particularly valuable here.

High-Capacity Stations

Charging stations in Cortlandt average 9.0 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Cortlandt?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)