3 EV Charging Stations in Grants, NM

Locations, networks, and charger types — updated weekly from U.S. DOE data

3
Charging Stations

3 EV charging stations in Grants — 2 ChargePoint Network, 1 Electrify America , 6 public DC fast chargers. Last updated May 9, 2026.

Where Are the 3 Charging Stations in Grants?

Walmart 2652 - Grants, NM

1000 Robert Rd
24 hours daily
CHAdeMO (DC Fast) CCS/SAE Combo

MILAN NMDOT6 EV #3

1854 Pinon Dr
24 hours daily
CHAdeMO (DC Fast) CCS/SAE Combo

MILAN NMDOT6 EV #4

1854 Pinon Dr
24 hours daily
CHAdeMO (DC Fast) CCS/SAE Combo
All 3 stations active as of 2026-05-09 See full New Mexico outage report →

Which EV Charging Networks Operate in Grants, NM?

Infrastructure Grade

100% DC Fast

Based on DC Fast Charger ratio

6 of 6 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 3
Ports per Station 2.0

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, Grants, New Mexico has 3 publicly accessible EV charging stations with 6 charging ports. ChargePoint Network operates 66.7% of stations in the area, followed by Electrify America at 33.3% — part of New Mexico's 511 stations statewide.

100% of ports (6) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include CCS, CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

Drivers needing more charging options can find 4 stations in nearby Gallup, approximately 91 miles away. See how NM compares with Texas for broader regional context.

What Is the EV Charging Outlook for Grants?

High-Speed Charging Hub

Grants has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.

ChargePoint Network Stronghold

ChargePoint Network leads the market in Grants with 67% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Grants?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)