2 working DC-fast stations in Bedford
All verified working this week, with 9 Level 2 ports across ChargePoint Network, Non-Networked, FLO.
Charging around Bedford, NH
Tap a dot for a station, or pick your car to see which stations fit. Dots in the surrounding area open that place's page.
City pages nearby
Active charging locations · 5
Showing 5 useful public-access records selected from 5 active locations. Counts distinguish locations from 14 ports and 8 connector-type records; availability is periodically refreshed, not live.
Genesis of Manchester
213 South River RoadGenesis of Manchester on South River Rd has 4 DC fast ports (J1772, CCS, Tesla/NACS) on the Blink Network, open 24/7.
NOURIA BEDFORD 1
195 S River RdNouria Bedford 1 on S River Rd has 1 DC fast port (CHAdeMO, CCS) on the ChargePoint Network, open 24/7.
The Chandler
107 South River RoadThe Chandler on South River Rd has 4 Level 2 ports on the FLO network, open 24/7.
STATION 1 BVI 1
12 Olde Bedford WayStation 1 Bvi on Olde Bedford Way has 2 Level 2 ports on the ChargePoint Network, open 24/7.
Local charging snapshot
Bedford charging basics
5 public stations with 14 charging ports. 5 DC fast ports (36%) for quicker stops , plus 9 Level 2 ports (64%) for longer stays.
AFDC data last synced November 9, 2026.
Charging costs and cheapest hours in Bedford
Cheapest time to charge today
Nearby city charging pages around Bedford
Boston, Massachusetts
Cambridge, Massachusetts
Worcester, Massachusetts
Marlborough, Massachusetts
Quincy, Massachusetts
Waltham, Massachusetts
Lowell, Massachusetts
Newton, Massachusetts
Framingham, Massachusetts
Somerville, Massachusetts
EV charging questions for Bedford
Which EV charging networks operate in Bedford, NH?
Bedford has 4 charging networks. ChargePoint Network operates 40% of stations, serving 5 total stations.
What is the EV charging outlook for Bedford?
36% of Bedford's charging ports are DC fast chargers and 64% are Level 2.
When is the cheapest time to charge an EV in Bedford?
Today's cheapest, greenest grid window in Bedford is 12 AM – 3 AM EST, based on ISO New England day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Dataset snapshot: November 9, 2026. Availability is periodically refreshed.
🏨 Charge While You Stay — Hotels with EV Charging in Bedford
1 hotel with on-site EV charging · 1 Tesla Destination · 1 Level 2 ports
Bedford Village Inn
⚡ Tesla2 Olde Bedford Way
Tesla Destination: full charge in 6–10 hrs overnight
📍 View on Map