Verified · Jun 21, 2026

12 working DC fast chargers in St. Peters

All verified working this week, with 21 Level 2 ports across ChargePoint Network, Blink Network, Non-Networked.

Live reliability
12 working now none down

Stations · 20

98% working at Missouri · verified Jun 7, 2026

CBL Mid Rivers Mall (St Peters, MO)

1600 Mid Rivers Mall
Working
Electrify America DC Fast 6 ports CCS/SAE Combo
98% working

Saint Charles Nissan

5625 Veterans Memorial Pkwy
Working
Non-Networked DC Fast 2 ports CHAdeMO + J1772
98% working

CHURCH ON ROCK STATION 1

900 Birdie Hills Road St
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Working
ChargePoint Network Level 2 2 ports J1772
99% working

BOMMARITO MAZDA MAZDA SALES

4190 I-70 North Outer Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Building 5 Reserve Mid Rivers Apartments

5100 Syrah Circle
Working
Blink Network Level 2 2 ports J1772
95% working

Building 8 Reserve Mid Rivers

8100 Syrah Circle
Working
Blink Network Level 2 2 ports J1772
95% working

Building 7 Reserve Mid Rivers

7100 Merlot Drive
Working
Blink Network Level 2 2 ports J1772
95% working

Building 4 Reserve Mid Rivers Apartments

4100 Syrah Circle
Working
Blink Network Level 2 2 ports J1772
95% working

OBE EMBASSY SCHAR R

2 Convention Center Plaza
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Saint Charles Nissan

5625 Veterans Memorial Pkwy
Working
Non-Networked Level 2 1 port J1772
98% working
Working
ChargePoint Network Level 2 1 port J1772
99% working

SCH5701 SCH5701LEV3S

5701 Veterans Memorial Pkwy
Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo
99% working

SCH5701 SCH5701LEV3N

5701 Veterans Memorial Pkwy
Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo
99% working

BOMMARITO VW BVW-ISLAND2

4194 N Service Rd
Working
ChargePoint Network DC Fast 1 port CCS/SAE Combo
99% working

BOMMARITO VW BVW-ISLAND1

4194 N Service Rd
Working
ChargePoint Network DC Fast 1 port CCS/SAE Combo
99% working

NAPLETON HONDA PARKING LOT

4780 N Service Rd
Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo
99% working
Working
ChargePoint Network DC Fast 1 port CHAdeMO + CCS/SAE Combo
99% working

Building 23 Reserve Mid Rivers

3100 Syrah Circle
Working
Blink Network Level 2 1 port J1772
95% working

Building 21 Reserve Mid Rivers Apartments

21100 Syrah Circle
Working
Blink Network Level 2 1 port J1772
95% working
Home charging in Missouri costs 13.44¢/kWh — a full charge (60 kWh) costs about $8.06. Compare electricity prices →
All 20 stations active as of 2026-06-21 See full Missouri outage report →

Which EV Charging Networks Operate in St. Peters, MO?

Infrastructure Grade

38% DC Fast

Based on DC Fast Charger ratio

13 of 34 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 20
Ports per Station 1.7

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, St. Peters, Missouri has 20 publicly accessible EV charging stations with 34 charging ports. ChargePoint Network operates 55% of stations in the area, followed by Blink Network at 30% — part of Missouri's 1,410 stations statewide.

38% of ports (13) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 62% (21) are Level 2 chargers suited for longer stops. Available connector types include CCS, CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Missouri's EV infrastructure compares with Illinois.

What Is the EV Charging Outlook for St. Peters?

Strong Fast Charging Network

38% of charging ports in St. Peters are DC fast chargers, providing good options for quick charging sessions.

Where Else Can I Charge Near St. Peters?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."

Brent Gruber

Executive Director, EV Practice, J.D. Power

Source: J.D. Power 2025 Public Charging Study (August 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.