Latest reported · Aug 10, 2026

1 working DC-fast station in Olive Branch

All verified working this week, with 6 Level 2 ports across Tesla Destination, AMPUP, eVgo Network.

Latest reported availability
1 working now none down

Active charging locations · 4

97% working at Mississippi · verified Aug 10, 2026

Showing 4 useful public-access records selected from 4 active locations. Counts distinguish locations from 10 ports and 4 connector-type records; availability is periodically refreshed, not live.

Flying J Travel Center 677

4740 Bethel Road
Working
eVgo Network DC Fast 4 ports CCS/SAE Combo
Working
AMPUP Level 2 4 ports J1772

Hotel DeSoto - Tesla Destination

8877 Mid South Drive
Working
Tesla Destination Level 2 1 port Tesla

Historic Whispering Woods Hotel and Conference Center Olive Branch - Memphis - Tesla Destination

7300 Hacks Cross Rd
Working
Tesla Destination Level 2 1 port Tesla

Local charging snapshot

Olive Branch charging basics

4 public stations with 10 charging ports. 4 DC fast ports (40%) for quicker stops , plus 6 Level 2 ports (60%) for longer stays.

AFDC data last synced August 10, 2026.

4
stations
10
ports
4
DC fast
6
Level 2
Charging costs and cheapest hours in Olive Branch
Home charging costs
Compare Mississippi electricity prices →

Cheapest time to charge today

The cheapest, greenest grid window in Olive Branch today is 1 AM – 4 AM CDT, based on MISO day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.

Nearby city charging pages around Olive Branch

EV charging questions for Olive Branch

Which EV charging networks operate in Olive Branch, MS?

Olive Branch has 3 charging networks. Tesla Destination operates 50% of stations, serving 4 total stations.

What is the EV charging outlook for Olive Branch?

40% of Olive Branch's charging ports are DC fast chargers and 60% are Level 2.

When is the cheapest time to charge an EV in Olive Branch?

Today's cheapest, greenest grid window in Olive Branch is 1 AM – 4 AM CDT, based on MISO day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Dataset snapshot: August 10, 2026. Availability is periodically refreshed.