Verified · Jun 21, 2026

No working DC fast chargers in Prior Lake yet

Just 22 Level 2 ports across ChargePoint Network, Tesla Destination.

Live reliability
0 working now none down

Stations · 10

98% working at Minnesota · verified Jun 7, 2026

Mystic Lake Hotel and Casino - Tesla Destination

2400 Mystic Lake Blvd NW
Working
Tesla Destination Level 2 4 ports Tesla
98% working

MYSTIC LAKE CNT NORTH LOT 3

2400 Mystic Lake Blvd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

MYSTIC LAKE CNT NORTH LOT 4

2400 Mystic Lake Blvd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

MYSTIC L CASINO MAIN LOT 2

2400 Mystic Lake Blvd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

MYSTIC L CASINO MAIN LOT 1

2400 Mystic Lake Blvd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

CLEARY LAKE VISITOR CENTER

18106 Texas Ave
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PARKING LOT DDC EAST

2680 154th Street Northwest
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PARKING LOT DDC WEST

2680 154th Street Northwest
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PARKING LOT LSC WEST

2450 Sioux Trail Northwest
Working
ChargePoint Network Level 2 2 ports J1772
99% working

PARKING LOT LSC EAST

2450 Sioux Trail Northwest
Working
ChargePoint Network Level 2 2 ports J1772
99% working
Home charging in Minnesota costs 15.08¢/kWh — a full charge (60 kWh) costs about $9.05. Compare electricity prices →
All 10 stations active as of 2026-06-21 See full Minnesota outage report →

Which EV Charging Networks Operate in Prior Lake, MN?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 22 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 10
Ports per Station 2.2

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Prior Lake, Minnesota has 10 publicly accessible EV charging stations with 22 charging ports. ChargePoint Network operates 90% of stations in the area, followed by Tesla Destination at 10% — part of Minnesota's 1,193 stations statewide.

All 22 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Available connector types include Tesla (NACS). Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Minnesota's EV infrastructure compares with Wisconsin.

What Is the EV Charging Outlook for Prior Lake?

Level 2 Focused Infrastructure

Prior Lake's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

ChargePoint Network Stronghold

ChargePoint Network leads the market in Prior Lake with 90% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Prior Lake?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"These results show we're moving in the right direction, but there's still work to do to ensure all EV drivers have access to reliable, welcoming public charging."

Joel Levin

Executive Director, Plug In America

Source: Plug In America (October 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.