21 EV Charging Stations in Eagan, MN

Locations, networks, and charger types — updated weekly from U.S. DOE data

21
Charging Stations

21 EV charging stations in Eagan — 9 ChargePoint Network, 5 OpConnect, 3 Tesla Destination , 18 public DC fast chargers. Last updated May 9, 2026.

Where Are the 21 Charging Stations in Eagan?

Cub Foods - Tesla Supercharger

1940 Cliff Lake Rd
24 hours daily. Please check Tesla's online station map to see if an adapter is required at this location.
Tesla Grocery
Tesla

Viking Lakes Building B - Garage

720 Vikings Parkway
24 hours daily
OpConnect
J1772 (Level 2)

Simon-Twin Cities Premium Outlets (Eagan, MN)

3965 Eagan Outlets Pkwy
24 hours daily
CCS/SAE Combo

Viking Lakes Building D - Garage

690 Vikings Parkway
24 hours daily
OpConnect
J1772 (Level 2)

Viking Lakes Building A - Garage

740 Vikings Parkway
24 hours daily
OpConnect
J1772 (Level 2)

Viking Lakes Building C - Garage

700 Vikings Parkway
24 hours daily
OpConnect
J1772 (Level 2)

Hilton Garden Inn Minneapolis Eagan - Tesla Destination

1975 Rahncliff Ct
J1772 (Level 2) Tesla

Staybridge Suites Eagan Arpt South - Mall Area - Tesla Destination

4675 Rahncliff Rd
J1772 (Level 2) Tesla

DAKOTA COUNTY LEBANON 01

860 Cliff Road
24 hours daily
J1772 (Level 2)

VLIC Parking Ramp

2685 Vikings Circle, Suite 050
24 hours daily
OpConnect
J1772 (Level 2)

Inventure Eagandale

1305 Corporate Center Dr
24 hours daily
J1772 (Level 2)

DAKOTA COUNTY LEBANON 03

740 Cliff Road
24 hours daily
J1772 (Level 2)

DAKOTA COUNTY LEBANON 02

740 Cliff Road
24 hours daily
J1772 (Level 2)

SOLVENTUM EAGAN STATION 1

1750 Yankee Doodle Rd
24 hours daily
J1772 (Level 2)

SOLVENTUM EAGAN STATION 2

1750 Yankee Doodle Rd
24 hours daily
J1772 (Level 2)

SOLVENTUM EAGAN STATION 3

1750 Yankee Doodle Rd
24 hours daily
J1772 (Level 2)

SOLVENTUM EAGAN STATION 4

1750 Yankee Doodle Rd
24 hours daily
J1772 (Level 2)

Omni Viking Lakes Hotel - Tesla Destination

2611 Nordic Way
Tesla
1 station reported unavailable as of 2026-05-09 See full Minnesota outage report →

Which EV Charging Networks Operate in Eagan, MN?

Infrastructure Grade

24% DC Fast

Based on DC Fast Charger ratio

18 of 75 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 21
Ports per Station 3.6

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, Eagan, Minnesota has 21 publicly accessible EV charging stations with 75 charging ports. ChargePoint Network operates 42.9% of stations in the area, followed by OpConnect at 23.8% — part of Minnesota's 1,173 stations statewide.

24% of ports (18) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 76% (57) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS). Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Minnesota's EV infrastructure compares with Wisconsin.

What Is the EV Charging Outlook for Eagan?

Diverse Network Coverage

With 7 different charging networks available, EV drivers in Eagan have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Eagan?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Eagan

2 hotels with on-site EV charging · 2 Tesla Destination · 8 Level 2 ports

Hilton Garden Inn Minneapolis Eagan

⚡ Tesla

1975 Rahncliff Ct

🔌 4 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map

Staybridge Suites Eagan Arpt South - Mall Area

⚡ Tesla

4675 Rahncliff Rd

🔌 4 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map
"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."

Brent Gruber

Executive Director, EV Practice, J.D. Power

Source: J.D. Power 2025 Public Charging Study (August 2025)