Verified · Jun 21, 2026

1 working DC fast charger in New Brighton

All verified working this week, with 17 Level 2 ports across Blink Network, Non-Networked, Tesla Destination.

Live reliability
1 working now none down

Stations · 4

98% working at Minnesota · verified Jun 7, 2026

New Brighton Ford

1100 Silver Lake Rd. NW
Working
Blink Network Level 2 12 ports J1772
95% working

New Brighton Ford - DCFC

1100 Silver Lake Rd. NW
Working
Blink Network DC Fast 6 ports CCS/SAE Combo
95% working

Homewood Suites by Hilton Minneapolis-New Brighton - Tesla Destination

1815 Old Hwy 8 NW
Working
Tesla Destination Level 2 4 ports J1772 + Tesla
98% working

New Brighton Ford

1100 Silver Lake Rd NW
Working
Non-Networked Level 2 1 port J1772
98% working
Home charging in Minnesota costs 15.08¢/kWh — a full charge (60 kWh) costs about $9.05. Compare electricity prices →
All 4 stations active as of 2026-06-21 See full Minnesota outage report →

Which EV Charging Networks Operate in New Brighton, MN?

Infrastructure Grade

26% DC Fast

Based on DC Fast Charger ratio

6 of 23 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 4
Ports per Station 5.8

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, New Brighton, Minnesota has 4 publicly accessible EV charging stations with 23 charging ports. Blink Network operates 50% of stations in the area, followed by Non-Networked at 25% — part of Minnesota's 1,193 stations statewide.

26% of ports (6) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 74% (17) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS). Learn more in our Blink network. View national charging statistics for broader context.

For regional context, see how Minnesota's EV infrastructure compares with Wisconsin.

What Is the EV Charging Outlook for New Brighton?

High-Capacity Stations

Charging stations in New Brighton average 5.8 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near New Brighton?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in New Brighton

1 hotel with on-site EV charging · 1 Tesla Destination · 4 Level 2 ports

Homewood Suites by Hilton Minneapolis-New Brighton

⚡ Tesla

1815 Old Hwy 8 NW

🔌 4 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map
"City-to-city differences in climate, travel patterns, housing, charging preferences, and demographics aren't considerations captured in other infrastructure assessments. Making that data publicly available will prove pivotal as cities work to determine their network needs."

Eric Wood

Senior Researcher, National Renewable Energy Laboratory

Source: NREL (June 2023)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.