No working DC fast chargers in Rochester yet
Just 8 Level 2 ports across ChargePoint Network, Non-Networked.
Stations · 3
Oakland University - Engineering Center
115 Library DrROCHESTER LOT 6 PARKING 1
222 S Main StWhich EV Charging Networks Operate in Rochester, MI?
Looking for Tesla? Find Tesla Superchargers nationwide .
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 8 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Jun 23, 2026
Data sourced from U.S. DOE AFDC
As of June 2026, Rochester, Michigan has 3 publicly accessible EV charging stations with 8 charging ports. ChargePoint Network operates 66.7% of stations in the area, followed by Non-Networked at 33.3% — part of Michigan's 2,139 stations statewide.
All 8 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our ChargePoint network. View national charging statistics for broader context.
Drivers needing more charging options can find 264 stations in nearby Detroit, approximately 37 miles away. See how MI compares with Ohio for broader regional context.
What Is the EV Charging Outlook for Rochester?
Level 2 Focused Infrastructure
Rochester's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
ChargePoint Network Stronghold
ChargePoint Network leads the market in Rochester with 67% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Rochester?
Detroit, Michigan
Ann Arbor, Michigan
Troy, Michigan
Dearborn, Michigan
Novi, Michigan
Ferndale, Michigan
Auburn Hills, Michigan
Livonia, Michigan
Farmington Hills, Michigan
Warren, Michigan
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: June 21, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."