1 EV Charging Stations in Redford Charger Twp, MI
Locations, networks, and charger types — updated weekly from U.S. DOE data
1 EV charging stations in Redford Charger Twp — 1 RED_E . Last updated May 9, 2026.
Where Are the 1 Charging Stations in Redford Charger Twp?
Which EV Charging Networks Operate in Redford Charger Twp, MI?
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 4 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Redford Charger Twp, Michigan has 1 publicly accessible EV charging station with 4 charging ports. RED_E operates 100% of stations in the area — part of Michigan's 2,114 stations statewide.
All 4 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.
Drivers needing more charging options can find 264 stations in nearby Detroit, approximately 21 miles away. See how MI compares with Ohio for broader regional context.
What Is the EV Charging Outlook for Redford Charger Twp?
Level 2 Focused Infrastructure
Redford Charger Twp's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
RED_E Stronghold
RED_E leads the market in Redford Charger Twp with 100% of stations, making their membership particularly valuable here.
High-Capacity Stations
Charging stations in Redford Charger Twp average 4.0 ports each, reducing wait times and improving charging accessibility.
Where Else Can I Charge Near Redford Charger Twp?
Detroit, Michigan
Ann Arbor, Michigan
Troy, Michigan
Toledo, Ohio
Jackson, Michigan
Dearborn, Michigan
Novi, Michigan
Ferndale, Michigan
Auburn Hills, Michigan
Livonia, Michigan
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."