1 working DC fast charger in Niles
All verified working this week, with 12 Level 2 ports across Non-Networked, Blink Network.
Stations · 6
Campbell Ford DCFC
2801 South 11th StreetCity of Niles - Second Street Public Parking
211 2nd StCity of Niles - District Library
620 E Main StCity of Niles - Riverfront Park
34 Sycamore StWhich EV Charging Networks Operate in Niles, MI?
Looking for Tesla? Find Tesla Superchargers nationwide .
Infrastructure Grade
25% DC Fast
Based on DC Fast Charger ratio
4 of 16 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Jun 24, 2026
Data sourced from U.S. DOE AFDC
As of June 2026, Niles, Michigan has 6 publicly accessible EV charging stations with 16 charging ports. Non-Networked operates 66.7% of stations in the area, followed by Blink Network at 33.3% — part of Michigan's 2,139 stations statewide.
25% of ports (4) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 75% (12) are Level 2 chargers suited for longer stops. Available connector types include CCS. Learn more in our EV connector types guide. View national charging statistics for broader context.
For regional context, see how Michigan's EV infrastructure compares with Ohio.
What Is the EV Charging Outlook for Niles?
Non-Networked Stronghold
Non-Networked leads the market in Niles with 67% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Niles?
Kalamazoo, Michigan
Portage, Michigan
New Carlisle, Indiana
Mishawaka, Indiana
South Bend, Indiana
Valparaiso, Indiana
Goshen, Indiana
Merrillville, Indiana
Elkhart, Indiana
Michigan City, Indiana
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: June 21, 2026
"City-to-city differences in climate, travel patterns, housing, charging preferences, and demographics aren't considerations captured in other infrastructure assessments. Making that data publicly available will prove pivotal as cities work to determine their network needs."