2 EV Charging Stations in Imlay City, MI

Locations, networks, and charger types — updated weekly from U.S. DOE data

2
Charging Stations

2 EV charging stations in Imlay City — 1 FORD_CHARGE, 1 RED_E , 4 public DC fast chargers. Last updated May 9, 2026.

Where Are the 2 Charging Stations in Imlay City?

Imlay City Ford

1788 S Cedar St
24 hours daily
FORD_CHARGE Public
CCS/SAE Combo

Days Inn by Wyndham

6692 Newark Rd
RED_E Public
J1772 (Level 2)
All 2 stations active as of 2026-05-09 See full Michigan outage report →

Which EV Charging Networks Operate in Imlay City, MI?

Infrastructure Grade

67% DC Fast

Based on DC Fast Charger ratio

4 of 6 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 2
Ports per Station 3.0

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, Imlay City, Michigan has 2 publicly accessible EV charging stations with 6 charging ports. FORD_CHARGE operates 50% of stations in the area, followed by RED_E at 50% — part of Michigan's 2,114 stations statewide.

67% of ports (4) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 33% (2) are Level 2 chargers suited for longer stops. Available connector types include CCS. Learn more in our EV charging levels guide. View national charging statistics for broader context.

Drivers needing more charging options can find 264 stations in nearby Detroit, approximately 73 miles away. See how MI compares with Ohio for broader regional context.

What Is the EV Charging Outlook for Imlay City?

High-Speed Charging Hub

Imlay City has exceptional DC fast charging coverage with 67% of ports being high-speed chargers, well above the national average.

Where Else Can I Charge Near Imlay City?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)