2 EV Charging Stations in City of the Village of Clarkston, MI

Locations, networks, and charger types — updated weekly from U.S. DOE data

2
Charging Stations

2 EV charging stations in City of the Village of Clarkston — 1 FLO, 1 ChargePoint Network . Last updated May 9, 2026.

Where Are the 2 Charging Stations in City of the Village of Clarkston?

Village of Clarkston, 7 W Washington St

7 W Washington St
24 hours daily
FLO
J1772 (Level 2)

LOMBARDO INSIGNIA CH

4680 Clintonville Rd
24 hours daily
J1772 (Level 2)
All 2 stations active as of 2026-05-09 See full Michigan outage report →

Which EV Charging Networks Operate in City of the Village of Clarkston, MI?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 4 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 2
Ports per Station 2.0

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, City of the Village of Clarkston, Michigan has 2 publicly accessible EV charging stations with 4 charging ports. FLO operates 50% of stations in the area, followed by ChargePoint Network at 50% — part of Michigan's 2,114 stations statewide.

All 4 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 264 stations in nearby Detroit, approximately 49 miles away. See how MI compares with Ohio for broader regional context.

What Is the EV Charging Outlook for City of the Village of Clarkston?

Level 2 Focused Infrastructure

City of the Village of Clarkston's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

Where Else Can I Charge Near City of the Village of Clarkston?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)