Verified · Jun 21, 2026

4 working DC fast chargers in Bay City

All verified working this week, with 18 Level 2 ports across Non-Networked, ChargePoint Network, Blink Network.

Live reliability
4 working now none down

Stations · 14

97% working at Michigan · verified Jun 7, 2026

Meijer - Tesla Supercharger

2980 E Wilder Rd
Working
Tesla DC Fast 8 ports Tesla
98% working

Meijer Bay City (Bay City, MI)

2980 Wilder Rd
Working
Electrify America DC Fast 4 ports CCS/SAE Combo
98% working

Graff Chevrolet Bay City MI

3636 Wilder Rd
Working
RED_E DC Fast 4 ports CHAdeMO + J1772
96% working

Garber Ford Bay City - Series

3980 North Euclid Avenue
Working
Blink Network Level 2 4 ports J1772
95% working

Garber Ford Bay City - DCFC

3980 North Euclid Avenue
Working
Blink Network DC Fast 4 ports CCS/SAE Combo
95% working

Showcase Mitsubishi

1242 S Euclid Ave
Working
Non-Networked Level 2 3 ports J1772
98% working

Thelen Chrysler Jeep Dodge Ram

4191 N Euclid Ave
Working
Non-Networked Level 2 2 ports J1772
98% working

Thelen Audi Volkswagen Mazda

1112 N Euclid Ave
Working
Non-Networked Level 2 2 ports J1772
98% working

MICHIGAN DEPART STATION 1

3582 State Park Dr
Working
ChargePoint Network Level 2 2 ports J1772
99% working

MICHIGAN DEPART STATION 2

3582 State Park Dr
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Graff Chevrolet

3636 Wilder Rd
Working
Non-Networked Level 2 1 port J1772
98% working

Bay City - State Recreation Area

3582 State Park Dr
Working
Non-Networked Level 1 1 port J1772
98% working

Bay City - Water St Parking Lot

923 N Water St
Working
Non-Networked Level 1 1 port NEMA 14-50
98% working

Bay City - Delta College Planetarium

100 Center Ave
Working
Non-Networked Level 1 1 port NEMA 14-50
98% working
Home charging in Michigan costs 21.2¢/kWh — a full charge (60 kWh) costs about $12.72. Compare electricity prices →
All 14 stations active as of 2026-06-21 See full Michigan outage report →

Which EV Charging Networks Operate in Bay City, MI?

Infrastructure Grade

46% DC Fast

Based on DC Fast Charger ratio

18 of 39 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 14
Ports per Station 2.8

Data Status

Current

Last updated: Jun 23, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Bay City, Michigan has 14 publicly accessible EV charging stations with 39 charging ports. Non-Networked operates 50% of stations in the area, followed by ChargePoint Network at 14.3% — part of Michigan's 2,139 stations statewide.

46% of ports (18) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 46% (18) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our EV charging levels guide. View national charging statistics for broader context.

For regional context, see how Michigan's EV infrastructure compares with Ohio.

What Is the EV Charging Outlook for Bay City?

Strong Fast Charging Network

46% of charging ports in Bay City are DC fast chargers, providing good options for quick charging sessions.

Diverse Network Coverage

With 6 different charging networks available, EV drivers in Bay City have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Bay City?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"These results show we're moving in the right direction, but there's still work to do to ensure all EV drivers have access to reliable, welcoming public charging."

Joel Levin

Executive Director, Plug In America

Source: Plug In America (October 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.