Verified · Jun 21, 2026

5 working DC fast chargers in Gardner

All verified working this week, with 21 Level 2 ports across ChargePoint Network, Non-Networked.

Live reliability
5 working now none down

Stations · 14

99% working at Massachusetts · verified Jun 7, 2026

Department of Correction North Central Correctional Institution

500 Colony Rd
Working
ChargePoint Network Level 2 6 ports J1772
99% working

MT WACHUSETT CC MWCC STA 3

444 Green St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

MT WACHUSETT CC MWCC STA 2

444 Green St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

MT WACHUSETT CC MWCC STA 1

444 Green St
Working
ChargePoint Network Level 2 2 ports J1772
99% working

Gardner Department of Public Works

50 Manca Dr
Working
Non-Networked Level 2 2 ports J1772
98% working

SALVADORE AUTO SALVADORE L3 A

442 West Broadway
Working
ChargePoint Network DC Fast 2 ports CCS/SAE Combo
99% working

SALVADORE AUTO SALVADOR L3 B

442 West Broadway
Working
ChargePoint Network DC Fast 2 ports CCS/SAE Combo
99% working

DEPT OF CORR GARDNER CP1

138 Colony Rd
Working
ChargePoint Network Level 2 2 ports J1772
99% working

DEPT OF CORR GARDNER CP3

138 Colony Road
Working
ChargePoint Network Level 2 2 ports J1772
99% working

DEPT OF CORR GARDNER CP2

634 Pearl Street
Working
ChargePoint Network Level 2 2 ports J1772
99% working

ENERGICA ROBS DYNO SERV

45 Fredette Street
Working
ChargePoint Network DC Fast 1 port CCS/SAE Combo
99% working

NOURIA GARDNER 1

264 Timpany Boulevard
Working
ChargePoint Network DC Fast 1 port CCS/SAE Combo
99% working

NOURIA GARDNER 2

264 Timpany Boulevard
Working
ChargePoint Network DC Fast 1 port CCS/SAE Combo
99% working

Department of Conservation & Recreation Dunn State Park

289 Pearl St
Working
Non-Networked Level 2 1 port J1772
98% working
Home charging in Massachusetts costs 30.21¢/kWh — a full charge (60 kWh) costs about $18.13. Compare electricity prices →
All 14 stations active as of 2026-06-21 See full Massachusetts outage report →

Which EV Charging Networks Operate in Gardner, MA?

Infrastructure Grade

25% DC Fast

Based on DC Fast Charger ratio

7 of 28 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 14
Ports per Station 2.0

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Gardner, Massachusetts has 14 publicly accessible EV charging stations with 28 charging ports. ChargePoint Network operates 85.7% of stations in the area, followed by Non-Networked at 14.3% — part of Massachusetts's 4,577 stations statewide.

25% of ports (7) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 75% (21) are Level 2 chargers suited for longer stops. Available connector types include CCS. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Massachusetts's EV infrastructure compares with New York.

What Is the EV Charging Outlook for Gardner?

ChargePoint Network Stronghold

ChargePoint Network leads the market in Gardner with 86% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Gardner?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"These results show we're moving in the right direction, but there's still work to do to ensure all EV drivers have access to reliable, welcoming public charging."

Joel Levin

Executive Director, Plug In America

Source: Plug In America (October 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.