Latest reported · Aug 21, 2026

1 working DC-fast station in Millinocket

All verified working this week, with 11 Level 2 ports across FLO, Non-Networked, JULE.

Latest reported availability
1 working now none down

Active charging locations · 6

98% working at Maine · verified Aug 21, 2026

Showing 6 useful public-access records selected from 6 active locations. Counts distinguish locations from 13 ports and 7 connector-type records; availability is periodically refreshed, not live.

Getting there

Getting into Millinocket

East · Central St
2 stations · closest 0.7 km from downtown
West · Penobscot Ave
2 stations · closest 0.8 km from downtown
Veterans Park· 2 Level 2

Tractor Supply Plaza

800 Central St

Tractor Supply Plaza on Central St has 2 DC fast ports (CCS, Tesla/NACS) on the JULE network, open 24/7.

Working
JULE DC Fast 2 ports CCS/SAE Combo + Tesla

Spoiled Hair Studio

905 Central St

Spoiled Hair Studio on Central St has 2 Level 2 ports, non-networked, free to use and open 24/7.

Working
Non-Networked Level 2 2 ports J1772

Millinocket Library

5 Maine Ave

Millinocket Library on Maine Ave has 4 Level 2 ports on the FLO network, open 24/7.

Working
FLO Level 2 4 ports J1772

Veterans Park

70 Penobscot Ave

Veterans Park on Penobscot Ave has 2 Level 2 ports on the FLO network, open 24/7.

Working
FLO Level 2 2 ports J1772

Baxter State Park

64 Balsam Dr

Baxter State Park on Balsam Dr has 1 Level 2 port, non-networked, free to use and open 24/7.

Working
Non-Networked Level 2 1 port J1772

Municipal Parking Lot

158 Penobscot Ave.

Municipal Parking Lot on Penobscot Ave has 2 Level 2 ports on the FLO network, open 24/7.

Working
FLO Level 2 2 ports J1772

Local charging snapshot

Millinocket charging basics

6 public stations with 13 charging ports. 2 DC fast ports (15%) for quicker stops , plus 11 Level 2 ports (85%) for longer stays.

AFDC data last synced August 21, 2026.

6
stations
13
ports
2
DC fast
11
Level 2
Charging costs and cheapest hours in Millinocket
Home charging costs
Compare Maine electricity prices →

Cheapest time to charge today

The cheapest, greenest grid window in Millinocket today is 12 PM – 3 PM EDT, based on ISO New England day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.

Nearby city charging pages around Millinocket

EV charging questions for Millinocket

Which EV charging networks operate in Millinocket, ME?

Millinocket has 3 charging networks. FLO operates 50% of stations, serving 6 total stations.

What is the EV charging outlook for Millinocket?

15% of Millinocket's charging ports are DC fast chargers and 85% are Level 2.

When is the cheapest time to charge an EV in Millinocket?

Today's cheapest, greenest grid window in Millinocket is 12 PM – 3 PM EDT, based on ISO New England day-ahead wholesale prices. On a time-of-use plan, your off-peak rate runs about ~12 AM - 6 AM.

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Dataset snapshot: August 21, 2026. Availability is periodically refreshed.