1 EV Charging Stations in Willington, CT
Locations, networks, and charger types — updated weekly from U.S. DOE data
1 EV charging stations in Willington — 1 Tesla , 16 public DC fast chargers. Last updated May 9, 2026.
Where Are the 1 Charging Stations in Willington?
Which EV Charging Networks Operate in Willington, CT?
Infrastructure Grade
100% DC Fast
Based on DC Fast Charger ratio
16 of 16 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Willington, Connecticut has 1 publicly accessible EV charging station with 16 charging ports. Tesla operates 100% of stations in the area — part of Connecticut's 1,701 stations statewide.
100% of ports (16) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include Tesla (NACS). Learn more in our Tesla Supercharger network. View national charging statistics for broader context.
Drivers needing more charging options can find 138 stations in nearby New Haven, approximately 88 miles away. See how CT compares with New York for broader regional context.
What Is the EV Charging Outlook for Willington?
High-Speed Charging Hub
Willington has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.
Tesla Stronghold
Tesla leads the market in Willington with 100% of stations, making their membership particularly valuable here.
High-Capacity Stations
Charging stations in Willington average 16.0 ports each, reducing wait times and improving charging accessibility.
Where Else Can I Charge Near Willington?
New Haven, Connecticut
Worcester, Massachusetts
Hartford, Connecticut
Marlborough, Massachusetts
Providence, Rhode Island
Springfield, Massachusetts
Waltham, Massachusetts
East Hartford, Connecticut
Bristol, Connecticut
Framingham, Massachusetts
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."