1 EV Charging Stations in Willington, CT

Locations, networks, and charger types — updated weekly from U.S. DOE data

1
Charging Stations

1 EV charging stations in Willington — 1 Tesla , 16 public DC fast chargers. Last updated May 9, 2026.

Where Are the 1 Charging Stations in Willington?

TA Travel Center - Tesla Supercharger

327 Ruby Rd
24 hours daily
Tesla Gas Station
Tesla
All 1 stations active as of 2026-05-09 See full Connecticut outage report →

Which EV Charging Networks Operate in Willington, CT?

Infrastructure Grade

100% DC Fast

Based on DC Fast Charger ratio

16 of 16 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 16.0

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, Willington, Connecticut has 1 publicly accessible EV charging station with 16 charging ports. Tesla operates 100% of stations in the area — part of Connecticut's 1,701 stations statewide.

100% of ports (16) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include Tesla (NACS). Learn more in our Tesla Supercharger network. View national charging statistics for broader context.

Drivers needing more charging options can find 138 stations in nearby New Haven, approximately 88 miles away. See how CT compares with New York for broader regional context.

What Is the EV Charging Outlook for Willington?

High-Speed Charging Hub

Willington has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.

Tesla Stronghold

Tesla leads the market in Willington with 100% of stations, making their membership particularly valuable here.

High-Capacity Stations

Charging stations in Willington average 16.0 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Willington?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)